Laserfiche WebLink
Addendum No. 3 ‐ Bidder Questions and Responses  <br />NE 174TH STREET ROADWAY IMPROVEMENTS  <br />CITY RFP NO. 14‐11‐01  <br />  <br />  <br />  <br />2  <br />  <br />  <br />you please advise how much muck removal will be required when it is encountered – 30‐ <br />inches, 36‐inches, complete removal, etc.  <br />  <br />Response: Please refer to Attachment B and Technical Specifications provided.  <br /> <br /> <br />6. Bid Proposal Form:  Is the bid proposal form available in either excel or word format?  <br />  <br />Response: No. However, those with Adobe writer should be able to copy and convert the  <br />table to an Excel sheet for their in‐office use. The bid shall be submitted in the form  <br />provided by the City. Any attempt to alter, modify, or enhance this form may result in a  <br />disqualification of your bid.  <br />  <br />  <br />7. Off‐Duty Officers:  Please add an allowance line item for off‐duty officer, since the  <br />requirement for this service is unknown at this time.   <br />  <br />Response: The estimated cost per hour has been provided in the RFP. The need for off‐ <br />duty police support is at the sole discretion of each prospective bidder based on their  <br />proposed construction methodology and MOT plan to be implemented. Bidders are  <br />advised to carefully consider these factors and make the necessary allowances within the  <br />line item provided for Maintenance of Traffic currently provided in the bid form. Note that  <br />all road closures, full and partial, shall require coordination with first responder services.   <br />  <br />  <br />8. In reading the Bid Proposal Form Page 36 Notes, the note seems to indicate that it is both  <br />a lump sum project and unit price project.   Could you please clarify whether this will be  <br />a unit price project, lump sum project or Guaranteed Maximum Price?   <br />Response:  The bid has unit prices as well as lump sum prices.  Lump sum prices are fixed  <br />and unit prices can have over or under‐runs.  Furthermore, payment for pipe will be based  <br />on field measured‐installed quantities; from inside wall to inside wall.  <br />  <br />  <br />9. On the summary of the Prebid meeting, the City is requesting an Off‐Duty Police Officers  <br />but the Contractor does not know, when, where, how many and how much time the city  <br />will request it. It is very difficult to calculate the number of hours and some Contractors  <br />assumes a few and others a lot. We believe that is fair that the City include an item with  <br />an Allowance or Estimate a number of man hours for Police Officers and use them a  <br />discretion of the City,  thereby everybody  is in the same page .  <br />  <br />Response:  See response to item no. 7.    <br />  <br />  <br />10. The Item # 74 says, “Installation of Bus Shelters….” ( C‐31 ). That means, Furnish and  <br />Install, right? And reinstall the existing benches and waste trash, right? (Sta 36+00 and