Laserfiche WebLink
  <br />City of Sunny Isles Beach | Invitation to Bid No. 17‐05‐01  28    <br />  <br /> The Contractor is solely responsible for, and must replace and make good all loss, injury, or damage <br />to any property including, but not limited to, landscaping, irrigation, walks, drives, structures, or <br />utilities resulting from performance of the Work. <br /> <br />2.24 CONTRACTOR’S RESPONSIBILITY FOR UTILITY PROPERTIES AND SERVICE <br /> <br /> Where the Contractor’s operations could cause damage or inconvenience to telephone, fiber optic, <br />television, electrical power, oil, gas, water, sewer, or irrigation systems, the Contractor must make <br />all arrangements necessary for the protection of these utilities and services or any other known <br />utilities. <br /> <br />Notify all utility companies that are affected by the construction operation at least forty-eight (48) <br />hours in advance. Under no circumstance expose any utility without first obtaining permission from <br />the appropriate agency. Once permission has been granted, locate, expose, and provide temporary <br />support for all existing underground utilities and utility poles where necessary. <br /> <br />The Contractor and its Subcontractors will be solely and directly responsible to the owner and <br />operators of such properties for any damage, injury, expense, loss, inconvenience, delay, suits, <br />actions, or claims of any character brought because of any injuries or damage which may result <br />from the construction operations under the Contract Documents. <br /> <br />Neither the City nor its officers or agents will be responsible to the Contractor for damages as a <br />result of the Contractor’s failure to protect property encountered in the Work. <br /> <br />In the event of interruption to domestic water, sewer, storm drain, or other utility services as a <br />result of accidental breakage due to construction operations, Contractor must promptly notify the <br />owner, any required regulatory authority, and the Project Manager(s). Contractor shall also <br />cooperate with said authority in restoration of service as promptly as possible and bear all costs of <br />repair and any required interim measures to ensure safety. In no event will interruption of any <br />utility service be allowed unless granted by the owner of the utility. <br /> <br />In the event water service lines that interfere with trenching are encountered, the Contractor may, <br />by obtaining prior approval of the water utility, cut the service, dig through, and restore the service <br />with similar and equal materials at the Contractor’s expense and as approved by the Project <br />Manager(s). <br /> <br />The Contractor shall replace with material approved by the Project Manager(s) or Consultant, at <br />Contractor’s expense, any and all other laterals, existing utilities or structures removed or damaged <br />during construction, unless otherwise provided for in the Contract Documents and as approved by <br />the Project Manager(s) or Consultant. <br /> <br />The Contractor shall replace with material approved by the Project Manager or Consultant, at <br />Contractor’s expense, any existing utilities damaged during the Work. <br />