Laserfiche WebLink
  <br />City of Sunny Isles Beach | Invitation to Bid No. 17‐05‐01  31    <br />  <br />2.30 ANNUAL EXECUTION PLAN <br /> <br />The Annual Execution Plan (“AEP”) must include a breakdown of the Work to be performed on a <br />monthly basis by Task and Site, and must also include a breakdown of the labor force and <br />equipment to be used on a monthly basis. The Contractor must reflect in the AEP when the annual <br />planting change-outs, pruning, mowing, fertilization, mulching, tree and palm maintenance, <br />irrigation maintenance, etc. will occur. The AEP must also reflect a budget estimate for each <br />month. <br /> <br />The initial AEP must be submittal within fourteen (14) days of execution of the Contract. Each <br />subsequent AEP must be submitted one month prior to the start of the new Contract year. Any <br />revisions to the AEP must be subject to the prior written acceptance of the Project Manager. <br /> <br />2.31 QUALITY CONTROL PLAN <br /> <br />Within fourteen (14) days of the execution of the Contract, the Contractor must submit a Quality <br />Control Plan (“QCP”) to the Project Manager(s) for review and acceptance. The rationale <br />underpinning the QCP is that the Contractor is responsible for Quality Control. All methods, <br />procedures, and forms must support this rationale. The QCP must clearly identify how the <br />Contractor will monitor its own Work to ensure that the Work is performed and meets the <br />Performance Standards established in the Contract. The QCP must provide for the inspection and <br />assessment of the quality and progress of the Work at each Site where Work is being performed. <br />The QCP must be designed to keep the Contractor’s management and the City informed of all <br />issues affecting quality, to include timely and effective corrective action for all deficiencies. These <br />inspections must be in addition to the requirement for daily supervision. The QCP records must, <br />in part, consist of checklists of inspections and must indicate the nature, frequency and number of <br />observations made, number and type of deficiencies found, and the nature of corrective action <br />taken as appropriate. At a minimum the QCP must address the following: <br /> <br /> An inspection system that is tailored to the different Tasks and Sites covered under the <br />Performance Standards and Technical Specifications; <br /> A system for identifying and correcting deficiencies in the quality of the Work before the <br />level of performance becomes unacceptable and/or the Project Manager(s) or Consultant <br />independently identify the deficiencies; <br /> A system to ensure that the Contractor’s employees are notified of deficiencies, that the <br />noted deficiencies are corrected (if possible), and that the employees are <br />counseled/retrained as necessary to ensure that deficiencies do not recur; <br /> A system that provides the Project Manager(s) access to all Contractor documentation, <br />reports, and files (to include any forms on which quality control inspections are <br />documented) with respect to Contractor quality control inspections and any corrective <br />action taken; <br /> If the Contractor has a corporate/home office, how it will provide Contract support, <br />services, and controls; and