Laserfiche WebLink
r H- <br />W yr 7W4'' <br />2.25 A"tQb 1 V WA i ER AAD UT1L>[T><ES <br />The Contractor is r3Yan3iblz fur providing all water and power required for the performarcE of <br />the Work, including the use of a generators, fuel, etc. The u3e of a generator may be subject to <br />the prior approval of the Project Manager(3) and may be withheld when the Work is in a primarily <br />mAdEntial neighborhood. Electrical power required during construction moot be Installed by a <br />qualified electrical contractor approved by the PrjEct Manager(s). <br />Contractor will be m3pon5lble to provide all of its employee's sufficient ac7ebb to drinking water at <br />the Site(s). <br />The City may at its sole discretion provide access to City utllltieb or water should such be available <br />at the Work bite. However, the Conuauor is responsible to ax.e=n the IOCa Lion and accessibillty <br />of any uulides and potable water boon:�b necessary to perform the work. i ne ability 01 Me Dry <br />to make uulltleb available to the Contractor must not corm any Oasis nor a change Omer or claim <br />by the Lbntraaar. <br />L.ca CUORID AJ i iLUM EPP I nE wORR <br />i;rior to the commencement or the vvorR unser the CanU Tr me ProjeU Manager(s) will maRe <br />every eIToT Dasea on avallable Inrormadon, to nodry the Contractor or any ongoing or scheduled <br />projeR(s) mat will IN ongoing or commence ouring tRe vvorR on a Project that may require <br />cooralnation. i ne Contractor will M solely responsible for coordinating the Work with any other <br />project(s) to minimize any potential ad.erse Impact. Contractor will not bc entitled tv any days of <br />dela, for failure to properly coordinate the Work. The Projcct Manager(3) may assist the Contractor <br />in coordinating the Work. Howcvar, any Such assistance, or lack thereof will not form the basis fvr <br />any claim for delay or increased Z -03t. <br />If any part of Contractor's Work depends upon piper eecution or results from the work of any <br />other persons, Contractor mu3t In3pcct and promptly report to Project Manageg3) any dzfects in <br />Such wurk that render It unsuitable for such execution and malts. Contractor's failure to so Inspect <br />and icport will constitute an acceptance of the other person's work as fit and proper for the <br />reception of Contractor's Work, mzmpt as to defects which may develop in other contractor's work <br />after the execution of contractor's Work. Contractor must conduct its operationb and take all <br />rcabonable steps to coordinate the prosecution of the Work so as to create no Interference or <br />Impact on any other contractor on the Site. Should such interference or ImpaR occur, Conudl-tor <br />will be liable to the affected contractor for the cost of such interference or ImpaR. <br />2.27 ACCESS TO THE PRUACT za a [fa) <br />City will provide the lands upon wMlcll we vvorR Is tMe Ge perrormea, rigrits-or-way ano easements <br />for access thereto and such other IanGs as are tiesignate0 IQy City For use or Contractor. <br />City or Sunny Isles SeacR I Invitation to Sita Ido. <br />b <br />Lyes' Lauclmicapingj Inc. i <br />