My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2017-2715
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2017
>
Reso 2017-2715
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/25/2018 10:15:19 AM
Creation date
7/21/2017 4:46:09 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2017-2715
Date (mm/dd/yyyy)
07/20/2017
Description
Interlocal/MOU w/MDC for Skate Park at Haulover Park
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
shall be solely responsible for overseeing the construction project from permitting through final <br />completion. <br />c. The CITY agrees to perform the construction work as provided herein, in compliance with all <br />applicable local, State, and Federal laws, including but not limited to Section 255.20 of the Florida <br />Statutes. <br />d. Before acceptance of the project, the CITY shall cause and require its Contractor to develop and <br />install signage that is consistent with Skatepark/Pumptruck safety rules and usage. Prior to fabrication <br />and installation, a draft of the verbiage shall be submitted to the COUNTY for its final approval. <br />e. The COUNTY shall be named as an express third party beneficiary of the contract between CITY <br />and its Contractor prior to commencement of any work and the CITY shall provide a copy of the <br />construction contract with the Contractor to the County within ten (10) days of this AGREEMENT <br />and prior to the commencement of construction. <br />f The CITY shall have no further legal responsibility or liability with regards to constructing any <br />Improvements on the SKATE PARK once Final Completion of the SKATE PARK, as defined in the <br />AGREEMENT between the CITY and Contractor, is completed. <br />5. Project Design <br />a. Testing: CITY shall coordinate with COUNTY personnel any necessary access to the site for testing <br />purposes and obtain authorization prior to conducting such tests. All areas disturbed by any tests shall <br />be restored and/or stabilized to COUNTY's satisfaction. <br />b. 15% Plans. When 15% of the overall design of the SKATE PARK has been completed (i.e., Concept <br />Plans and including site layouts), CITY shall submit two copies of'such Preliminary Plans to PROS <br />for review, to insure conformity with Proposed Concept Plans shown in Exhibit I and the Haulover <br />Park approved general plan hereby included in Exhibit 1B. The Preliminary Plans must be prepared <br />by an architect or engineer licensed to practice in the State of Florida. If the COUNTY has any <br />comments and/or proposed modifications to the Preliminary Plans, the COUNTY shall provide <br />comments and/or proposed modifications in writing to the CITY within fifteen days (15) calendar <br />days from the date of submittal of the Preliminary Plans. CITY shall incorporate said comments into <br />a set of revised Preliminary Plans to be reviewed and approved by the County. <br />c. 50% Plans and Specifications. The 50% Plans and Specifications shall be based on the approved <br />Preliminary Plans and shall show without limitation any/all work to be performed in the field, <br />including site plans; architectural, structural, grading, and drainage plans, signage and all other <br />disciplines engaged in the development of the construction documents of the SKATE PARK. CITY <br />shall provide PROS sufficient information to enable PROS to make an informed judgment about the <br />design and quality of construction. Within fifteen (15) calendar days after PROS receives the 50% <br />Plans and Specifications, PROS shall either approve them or deliver to CITY specific corrective <br />comments. CITY shall resolve all comments and requests for modifications by PROS to the 50% <br />Plans and Specifications and obtain written approval from PROS prior to proceeding with the <br />development of the Final Plans. <br />Page 4 ofml 6'3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.