Reso 2017-2715
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/25/2018 10:15:19 AM
Creation date
7/21/2017 4:46:09 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2017-2715
Date (mm/dd/yyyy)
07/20/2017
Description
Interlocal/MOU w/MDC for Skate Park at Haulover Park
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
d. Final Plans. CITY shall prepare and deliver to PROS a complete set of the final plans and <br />specifications which shall show without limitation any/all work to be performed in the field, including <br />site plans; architectural, structural, grading and drainage plans, signage and all other disciplines <br />engaged in the development of the construction documents and completed technical specifications; <br />all sufficient to enable PROS to make an informed judgment about the design and quality of <br />construction and with sufficient detail so as to allow for the issuance of a building Permit (hereinafter <br />referred to as "Final Plans"). The Final Plans shall be based upon, and consistent with, the approved <br />50% Plans and Specifications. PROS shall, within fifteen days (15) calendar days upon receipt of <br />the Final Plans, either approve them or deliver to CITY specific corrective comments. CITY shall <br />resolve all comments and requests for modifications by PROS to the Final Plans and obtain written <br />approval from PROS prior to submitting the Final Plans to the regulatory agencies for permitting. <br />After the COUNTY has approved the Final Plans, the COUNTY shall not make any revisions to the <br />Plans. <br />e. Mobilization. It shall be the CITY's responsibility to ensure that all required regulatory or <br />proprietary permits are obtained by its Contractor(s) prior to commencement of work Once <br />regulatory agencies have granted all necessary approvals and a permit(s) has/have been issued to the <br />Contractor, CITY shall provide COUNTY with copies of each issued permit. A Pre -Construction <br />Meeting will then be scheduled for the CITY's Contractor to coordinate with COUNTY's personnel <br />managing the park in respect to access, staging area, hours of operation, etc. After the Pre - <br />Construction Meeting, an authorization to occupy the site will be issued by the COUNTY to the CITY <br />thus allowing the Contractor's mobilization for the construction phase. After the CITY approves the <br />construction baseline schedule submitted by the Contractor, a copy shall be provided to the COUNTY <br />for informational purposes. <br />f. Construction Phase: <br />a) The CITY shall provide the COUNTY with copies of all approved submittals. <br />b) CITY's Contractor shall carefully plan and coordinate his/her activities to minimize any <br />adverse impact or disruptions to the COUNTY's operations and the patron's ability to safely <br />access and use the facility and/or secondary amenities/facilities (such as restrooms; water <br />fountains; vending machines; etc.) <br />c) CITY's Contractor shall implement and maintain specific steps/means to allow for such uses <br />and to prevent any hazards to patrons throughout the construction period. CITY's Contractor <br />limits of work should be properly fenced, and control over the points of access (such as gates, <br />etc.) should be maintained by CITY's Contractor at all times and always secured at the end <br />of each work period. <br />d) CITY's Contractor shall provide means for maintaining free, safe, and uninterrupted access <br />to the existing facility where work will be taking place and surrounding spaces must be safely <br />maintained at all time. <br />e) CITY's Contractor shall confine all permanent storage of materials and/or equipment to the <br />assigned construction area(s). <br />Page 5 of,mr C3 <br />