Laserfiche WebLink
• <br /> SJNNY is • <br /> Ci` , e As detailed on page 23, Performance <br /> PERFORMANCE B OND Bond in the amount of 0%is required. <br /> n <br /> 18070 Collins Avenue <br /> Sunny Isles Beach,FL 33160 <br /> Telephone:(305)947-0606 Fax:(305)949-3113 <br /> •P <br /> t9'' FL00.‘0 `'b. <br /> c T r°` 5U" FORM OF PERFORMANCE BO • <br /> ND <br /> • <br /> KNOW ALL MEN BY THESE PRESENTS: <br /> • <br /> That, pursuant to the requirements of Florida Statute 255.05, we, • <br /> , as Principal, hereinafter called Contractor, and <br /> • <br /> , as Surety, are bound to the City of Sunny Isles Beach, Florida, as Obligee, <br /> hereinafter called City, in the amount of Dollars ($ • <br /> ) for the payment whereof Contractor and Surety bind themselves, their heirs, executors, <br /> administrators, successors and assigns,jointly and severally. • <br /> • WHEREAS, Contractor has by written agreement entered into a Contract, Bid/Contract No.: <br /> , awarded the day of , 20 , for <br /> • <br /> in accordance with contract documents prepared by the City of A <br /> Sunny Isles Beach,which Contract is by reference made a part hereof,and is hereafter referred to as the Contract; <br /> • <br /> THE CONDITION OF THIS BOND is that if the Contractor: <br /> • <br /> 16.1. Fully performs the Contract between the Contractor and the City for • <br /> (Bid No. _ )within calendar days after the <br /> date of Contract commencement as specified in the Notice to Proceed and in the manner prescribed in the <br /> Contract; and • <br /> • <br /> 16.2. Indemnifies and pays City all losses, damages(specifically including, but not limited to,damages for delay <br /> and other consequential damages caused by or arising out of the acts, omissions or negligence of Contractor), • <br /> expenses, costs and attorney's fees including attorney's fees incurred in appellate proceedings, that City sustains <br /> • <br /> because of default by Contractor under the Contract; and <br /> 16.3. Upon notification by the City,corrects any and all defective or faulty Work or materials which appear within <br /> one and one half(1 1/2) years, and: <br /> 16.4. Performs the guarantee of all Work and materials furnished under the Contract for the time specified in <br /> the Contract,then this Bond is void,otherwise it remains in full force. Whenever Contractor shall be,and declared • <br /> by City to be, in default under the Contract, the City having performed City's obligations thereunder, the Surety • <br /> may promptly remedy the default, or shall promptly: <br /> 16.4.1. Complete the Contract in accordance with its terms and conditions; or • <br /> 16.4.2.Obtain a Bid or Bids for completing the Contract in accordance with its terms and conditions, and <br /> upon determination by Surety of the best, lowest, qualified, responsible and responsive Bidder, <br /> • <br /> or, if the City elects, upon determination by the City, and Surety jointly of the best, lowest, <br /> qualified, responsible and responsive Bidder, arrange for a Contract between such Bidder and <br /> City, and make available as Work progresses (even though there should be a default or a <br /> succession of defaults under the Contract or Contracts of completion arranged under this • <br /> paragraph) sufficient funds to pay the cost of completion less the balance of the Contract Price; • <br /> but not exceeding, including other costs and damages for which the Surety may be liable <br /> hereunder, the amount set forth in the first paragraph hereof. The term "balance of the Contract • <br /> Price."as used in this paragraph, shall mean the total amount payable by City to Contractor under <br /> • <br /> the Contract and any amendments thereto, less the amount properly paid by City to Contractor. <br />