Laserfiche WebLink
® - ITD (77 I• <br /> ace <br /> Mir <br /> SPECIFICATIONS <br /> ® Installation and disassembly <br /> Assembly for opening your rink <br /> ® PLANNING TYPE 12/14 12/15 12/16 12/17 12/18 12/19 , 12/20 <br /> ® Floor I Arrival and installation of equipment CUSTOMER x <br /> chalets reception I installaton material x <br /> ® Ice rink I Arrival and dispatching unloading equipment x <br /> Ice rink I Setting up the ice carpet and collectors x X x <br /> Ice rink I Connection to the cooling unit and commissioning X <br /> ® Ice rink I Mounting and installation of guardrails X <br /> Ice rink I Rise ice X X x x x <br /> Ice rink I Training of operating personnel x x <br /> Ice rink I Delivery of the ready to skate rink x <br /> This timing corresponds to a conventional assembly time off climatic constraints, it may be increased or <br /> ® decreased depending on the whims of the weather, the means used and the specifications of the <br /> customer loads, constraints site and working time daily. <br /> Disassembling your ice rink <br /> PLANNING TYPE 03/05 03/06 03/07 03/08 <br /> Stop machines x x <br /> ® Melting ice x x <br /> Dismantling of guardrails x <br /> Recovery of brine in barrels X <br /> Dismantling of the track and collectors X <br /> Repackaging of the rink equipment X <br /> Loading and departure of the rink equipment X <br /> ® Dismantling floor and reception center if you take this option X <br /> Loading and departure of the floor and structure x <br /> ® Your requirement will be ours and we will put the means to respond. <br /> 0 <br /> • <br /> ® SYNERGLACE USA I Request for Proposal No. 17-10-02 Page 29 on 60 <br />