My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Synerglace
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFP
>
RFP No. 17-10-02 Seasonal Ice Skating Rink
>
Responses
>
Synerglace
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/9/2017 3:41:24 PM
Creation date
11/9/2017 3:38:24 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Seasonal Ice Skating Rink
Bid No. (xx-xx-xx)
17-10-02
Project Type (Bid, RFP, RFQ)
RFP
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 <br /> - } g IAki <br /> a ce <br /> BREAKDOWN OF COMMITMENTS <br /> • <br /> ® WHAT IS THE RESPONSIBILITY OF THE COMPANY SYNERGLACE <br /> Project preparation <br /> • Participation in a preparatory meeting. <br /> ® Staff <br /> • Salaries and expenses related to our staff. <br /> • The transport, meals and accommodation for staff. <br /> Assembly and disassembly <br /> ® • Orientation and implementation of the construction of the security zone. <br /> • Installation of the rink as described below according to the ISO 9001 and ISO 14001 standards. <br /> • Installation Montage. <br /> ® • Watering and climb the ice until the ice is ready to skate. <br /> • Melting ice by boiler to avoid the city to clear the ice. <br /> • Dismantling of the ice track. <br /> ® • Transport unloading and reloading chiller by crane. <br /> • All transportation equipment Round trip. <br /> Insurance <br /> • Liability insurance. <br /> ® Assistance <br /> • Getting Started, technical monitoring of the facility and stop machines. <br /> • Assistance 24h/24, 7/7 <br /> 0 • Time of response (AS SPECIFICATION) with direct mobile number of technical sales charge of <br /> ® your project+ direct mobile number of a duty technician and this 24H /24 and 7/7 <br /> • intermediate chiller Technical Maintenance ise en route, suivi technique de ('installation et arr@t <br /> des machines. <br /> ® Coaching <br /> • technical training of staff who will operate the site: <br /> • Programming chillers as outside temperature, ice thickness management, treatment of the <br /> ® following ice climatic conditions encountered during the operation, repair in case of leakage track, <br /> glycol concentration, management of skates, no emergency, <br /> Audit and control <br /> ® • Providing all certificates of conformity facility (BVCTS, electricity, ice, ...) <br /> WHAT REMAINS TO YOUR CHARGE <br /> Above all you will be asked our client to provide the coordinates of reference on the record. Moreover it <br /> is required for the days and times indicated in the final schedule that has been restored, the <br /> establishment supplies, facilities or other listed below <br /> ® SYNERGLACE USA I Request for Proposal No. 17-10-02 Page 30 on 60 <br />
The URL can be used to link to this page
Your browser does not support the video tag.