Laserfiche WebLink
• <br /> wcne-irg I ace <br /> IIP <br /> FOR THE ICE RINK <br /> ® • Electricity near the chiller as described in the datasheet <br /> TECHNICAL DATA GROUP ATTACHMENT <br /> ® To provide essential and in working condition on the day of installation of the ice rink <br /> ® 1 PLUG P17 32A 5-pin, 3 phases and 1 neutral +earth <br /> for connecting the boiler of melting ice <br /> 1 standard 220V 16A near chillers <br /> ® Provide <br /> 1 electrician for connection and disconnection of the installation. <br /> In this case for your rink <br /> Electrical power <br /> ® Starting 400 Amps/ Phase <br /> ® Then 300 Amps/Phase <br /> For the host structure <br /> ® • 1 plug of 63A for lighting and heating <br /> • 1 electrician for connection and disconnection of the installation. <br /> ® For sound and light if you chose the option <br /> 1 Switchboard <br /> 380 Volts <br /> ® - 32 amps/ phase <br /> - 1 inlet type P17 <br /> ® - Differential circuit breaker 30 milliamperes <br /> ® Water for Ice rink <br /> • City Water pressure (13208 gl/24h)with fire hose and gun up to the 4 corners of the rink. <br /> Responsabilities <br /> ® • Secure Site. <br /> • Insurance <br /> S . Security hardware set up the day of arrival on site, until the end of rental removal even during the <br /> ® closure of the ice (this position guarding is not to be considered if it is part our offer). <br /> ® Miscellaneous <br /> • Salting around the rink in freezing and especially the melting of the ice. <br /> • The establishment of a bucket to evacuate the rubbish to the end of dismantling. <br /> ® SYNERGLACE USA I Request for Proposal No. 17-10-02 Page 31 on 60 <br /> • <br />