Laserfiche WebLink
<br />City of Sunny Isles Beach |Request for Qualifications No. 17-12-01 20 <br /> <br />Section 3 <br />Scope of Services / Technical Specifications <br /> <br />3.1 PURPOSE OF RFQ <br /> <br />The City of Sunny Isles Beach, Florida (the “City”) a municipality located on a barrier island in Northeast <br />Miami-Dade County, Florida, seeks to secure a contract with a licensed firm (“Firm”) to provide professional <br />architectural design services for construction projects to existing municipal buildings. Pursuant to Section <br />287.055, Florida Statutes, the City is requesting qualifications from experienced firms to provide <br />professional architectural services for Gateway Park located at 151 Sunny Isles Blvd, Sunny Isles Beach, FL <br />33160 and for the lobby of Government Center, 18070 Collins Avenue Sunny Isles Beach, FL 33160. <br />Professional architectural services are requested to produce all design and construction documents <br />necessary to bid, permit and construct renovations to these municipal buildings. The Gateway Park <br />renovations is intended to result in a Community Center, the indoor facility will include but not limited to <br />office space, reception area, multi-purpose rooms that can accommodate classes, meetings, banquets, and <br />an indoor stage, a catering kitchen, arts & crafts space, restrooms, and storage area, totaling approximately <br />17,420.00 square feet (Area A), attached herein exhibit A. In addition, Gateway Park will include a finishing <br />of concrete slab (Area B) totaling approximately 10,000 square feet (exhibit A). The Government Center <br />Lobby interior renovations (including the Visitor Center) is approximately 3,000 sq. ft. <br /> <br />The City is seeking to engage a qualified firm to design a Community Center facility build-out and to <br />renovate the lobby of the first floor Government Center at the highest industry standard. The general scope <br />of the project includes but not limited to the following: <br /> <br />1. Development of a 17,420+/- square foot Community Center (Area A) and finishing of concrete slab at <br />Gateway Park (Area B). In addition, the interior renovations for the Government Center lobby. <br /> <br />For the Government Center, this specific project anticipates the interior design of selective areas <br />being remolded within the existing Lobby and Visitor Center located on the Ground Floor. The <br />specifications include but is not limited to the following phases: <br /> <br />Lobby <br /> <br /> Selectively demolish existing security desk and credenza <br /> Design of new millwork and partial height glass partitions to capture more space for a second <br />glass enclosed workstation and provide additional storage, the intent is to have a welcoming <br />center to the public, while allowing the security guards to have an increase sense of protection. <br /> Provide additional millwork storage as possible, and hide printers from visitors view. <br /> New reception desks for two (2) guards. <br /> Consider location existing AV screen and spec of existing UV machine. <br /> Relocate power, data and telecom and security as required. <br /> Mechanical system: with our consultants (TLC) assess current odor situation and possible <br />causes: poor ventilation, fresh air intake, humidity levels, filters, possible mold and mildew in <br />ductwork. <br /> Existing ceiling soffits and lighting to remain.