My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
RFQ 17-12-01 Professional Arch Srvcs Interior Remodel Govt Ctr Lobby and Gateway Park Internal Space Build
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(17-12-01) Professional Arch Srvcs Interior Remodel Govt Ctr Lobby and Gateway Park Internal Space Build
>
RFQ 17-12-01 Professional Arch Srvcs Interior Remodel Govt Ctr Lobby and Gateway Park Internal Space Build
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/14/2017 11:22:45 AM
Creation date
12/14/2017 11:21:38 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />City of Sunny Isles Beach |Request for Qualifications No. 17-12-01 25 <br /> <br />M. Project close-out <br />N. Construction management <br /> <br />G. ADDITIONAL SERVICES: <br /> <br />1. For each phase, consultant agrees to furnish and provide the City five (5) full-size copies of all plans, <br />(two sets must be signed and sealed by architect’s sub -consultant) specifications, drawings, and other <br />documents and electronic versions of same in format prepared by the firm. <br /> <br />2. Hurricane Response: A representative from the awardee shall communicate via telephone, or report in <br />person (if telephone service is down) as soon as possible after any severe weather activity, including tropical <br />storms, or hurricanes in order to evaluate and delineate a plan to mitigate and repair damages. <br /> <br />3.3 ESTIMATE PROJECT CONSTRUCTION COST <br /> <br />The City’s Construction Budget is the amount budgeted for the construction award of the Project, including <br />connections to utilities but is exclusive of cost of land, change order contingencies, movable furnishings <br />and equipment, and professional fees. For this Project, the firm must provide an estimate with their <br />proposal. Since the architect does not have control over the cost of labor and materials, or over competitive <br />bidding and market conditions, the estimates of construction cost provided for herein are to be m ade on <br />the basis of the architect experience and qualifications, but the architect does not guarantee the accuracy <br />of its estimates of probable cost as compared to the Construction Manager's (or Consultant's) bids. <br /> <br />By fifty (50%) percent completion of the Construction Documents Phase, the architect shall resolve with <br />the City and the Construction Manager (Consultant) any apparent discrepancy between its Estimates of <br />Probable Project Construction Cost and the scope and requirements of the City. The architect will be <br />permitted to include acceptable alternates in the Contract Documents for the purpose of providing a finished <br />and acceptable facility within the City’s Construction Budget. <br /> <br />3.4 REQUIREMENTS OF THE CONSULTANTS <br /> <br />Qualification submittals will be considered from qualified firms whose experience includes successful work <br />in similar projects. Also, the firm must have a sufficient number of qualified staff in the applicable disciplines <br />to complete the work in the time required and in accordance with State of Florida statutes and standards, <br />if applicable. <br /> <br />The selected firm(s) will be responsible for reviewing existing Miami -Dade County, City of Sunny <br />Isles Beach Codes, Resolutions and Ordinances and State of Florida Building Codes and for incorporating <br />data into complete construction documents including final construction plans (working drawings), technical <br />specifications, construction estimates, and related bid documents necessary for the bidding and <br />construction of the projects. <br /> <br />The selected firm(s) will be responsible for obtaining all Federal, State and local permits and / or approvals <br />from Miami-Dade Water and Sewer, DERM, Florida Department of Environmental Protection as necessary <br />and all City of City of Sunny Isles Beach Building permits necessary for the construction of the projects.
The URL can be used to link to this page
Your browser does not support the video tag.