My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2012-1996
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2012
>
Reso 2012-1996
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/6/2012 4:31:54 PM
Creation date
11/20/2012 10:42:07 AM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2012-1996
Date (mm/dd/yyyy)
11/15/2012
Description
1st Amd to Agmt w/LIVS Assoc: Design Revisions to Arlen House Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Preview Page 2 of 2 <br /> 3)The original design was prepared under the 2007 Florida Building Code and the City <br /> has since adopted the 2010 Florida Building Code. Code, as well as sound engineering <br /> practice, requires that geotechnical services be performed to substantiate foundation <br /> design for the wall and is included in this proposal noting that geotechnical services had <br /> not been included in the original contract for design services. <br /> Design on the project will occur in two distinct phases. Schematic design will be done <br /> and includes renderings that accurately reflect proposed improvements for approval by <br /> City Commission and management. Upon approval by the City, the construction <br /> drawings will be revised and the project will be processed for permits. Note that due to <br /> some work elements being within FDOT right of way, a Construction Agreement with <br /> FDOT will be required and will be processed by the City at a later date. Subsequent to <br /> the incorporation of any changes to the design drawings due to jurisdictional agency <br /> requirements,the project will be publicly bid. <br /> COST: <br /> Cost not to exceed $45,924.00. <br /> FUNDING SOURCE: <br /> Funding is available in account number 20-600-5697. <br /> ATTACHMENTS: <br /> • Proposal <br /> http://sibagenda.sibfl.net/agenda/Preview.aspx?ItemID=910&MeetinglD=O&MeetingDate... 11/9/2012 <br />
The URL can be used to link to this page
Your browser does not support the video tag.