Laserfiche WebLink
® 0 gym• <br /> T U R F <br /> TV 60 <br /> 3.0 EXECUTION <br /> 3.1 GENERAL <br /> A. The installation shall be performed in full compliance with approved shop drawings. <br /> B. Only factory-trained technicians, skilled in the installation of athletic caliber synthetic turf systems <br /> working under the direct supervision of the synthetic turf manufacturer's installation supervisors <br /> shall undertake the placement of the system. <br /> C. The surface to receive the synthetic turf shall be inspected and certified by the turf manufacturer <br /> as ready for the installation of the synthetic turf system and must be perfectly clean as installation <br /> commences and shall be maintained in that condition throughout the process. <br /> 3.2 INSTALLATION <br /> A. The subbase and curbs shall be inspected by the Engineer or Sitework Contractor by means of a <br /> laser level and plotted on a 10-foot grid. Based upon the Contractor's inspection of the topological <br /> survey, the Sitework Contractor shall fine grade the subbase suitably - including properly rolling <br /> and compacting the base to achieve a surface planarity within /" in 10 feet (+0, -1/4"0). <br /> OWNER, ENGINEER OR PRIME CONTRACTOR SHALL NOT APPROVE THE SUBBASE FOR <br /> ® <br /> TOLERANCE TO GRADE WITHOUT OBTAINING THE TOPOLOGICAL SURVEY. <br /> B. The Turf Project Superintendent shall thoroughly inspect all materials delivered to the site both for <br /> quality and quantity to assure that the entire installation shall have sufficient materials to maintain <br /> the schedule and proper mixing ratios. <br /> C. Synthetic turf shall be loose laid across the field and attached to the perimeter edge detail. Turf <br /> shall be of sufficient length to permit full cross-field installation. No head or cross seams will be <br /> allowed, except as required for inlaid fabric striping or to accommodate programmed cut-outs. <br /> D. All seams shall be flat, tight, and permanent with no separation or fraying. All seams and <br /> markings shall be adhered to a special tape with a single component, high strength polyurethane <br /> adhesive applied per the Turf Supplier's standard procedures for outdoor applications. <br /> E. Infill materials shall be properly applied in numerous thin lifts using special broadcasting <br /> equipment to produce a layered system of pea gravel and SBR rubber particles. The turf shall be <br /> raked and brushed properly as the mixture is applied. The infill material shall be installed to a <br /> depth of about 1.75 inches. The layered system of pea gravel and rubber infill materials can only <br /> be applied when the turf fabric is dry. <br /> F. Weather/climatic conditions may be a factor in delay of installation, but shall not warrant the <br /> accrual of additional liquidated damages. Should the ambient outdoor temperature fall below 45 <br /> degrees F, the Contractor and Owner will discuss available options and/or stoppage of work. <br /> However, the final decision shall be at the Contractor's discretion. <br /> 7 <br /> ,- Hellas Construction,Inc. REP#12.10-03 P.116 <br />