Laserfiche WebLink
On 'arm T U R F <br /> TV 60 <br /> 3.3 FIELD MARKINGS AND DECORATIONS <br /> A. Field markings and decorations shall be installed in accordance with approved project shop <br /> drawings. <br /> 3.4 CLEAN UP <br /> A. Turf Contractor shall provide the labor, supplies and equipment as necessary for final cleaning of <br /> surfaces and installed items. <br /> B. All usable remnants of new material shall become the property of the Owner. <br /> C. The Turf Contractor shall keep the area clean throughout the project and clear of debris. <br /> D. Surfaces, recesses, enclosures, etc., shall be cleaned as necessary to leave the work area in a <br /> clean, immaculate condition ready for immediate occupancy and use by the Owner. <br /> ® 4.0 OTHER MATERIALS AND EQUIPMENT <br /> A. Maintenance Equipment <br /> Provide one(1)towed, non-powered Turf Sweeper with hitch, excluding prime mover vehicle. The <br /> sweeper attachment shall be of sufficient size to cover a 36" wide swath in a single pass. The <br /> sweeper attachment shall be fitted with synthetic bristle brushes as recommended by the <br /> synthetic turf manufacturer and shall be used primarily to collect surface debris. <br /> ® _ Hellas Construction, Inc. <br /> 12710 Research Blvd. Ste. 240 <br /> Austin,Texas 78759 <br /> T 512.250.2910 <br /> F 512.250.1960 <br /> c°°" '"` --- v.hellasconstniction.com 8 <br /> ewn <br /> Hellas Construction,Inc. RFP#12-10-03 P.117 <br />