My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Hellas Construction, Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFP
>
RFP No. 12-10-03 Artificial Turf for Senator Gwen Margolis and Pelican Community Parks
>
Responses
>
Hellas Construction, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/13/2012 12:09:59 PM
Creation date
12/13/2012 12:09:33 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Artificial Turf for Senator Gwen Margolis & Pelican C.Parks
Bid No. (xx-xx-xx)
12-10-03
Project Type (Bid, RFP, RFQ)
RFP
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
130
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Hellas <br /> 9. Provide and install 1" x 12" J-Drain MVP panel drains over subgrade at 20' on <br /> center. <br /> 10. Provide and install 4 inch layer of#57 stone, 1 inch layer of#89 stone and 1" <br /> layer of washed screenings; each layer laser graded and compacted to proper <br /> planarity and density. <br /> 11. Provide and install approximately 54,621 square feet of Brock SP14 Shock Pad. <br /> 12. Provide and install approximately 54,621 square feet of Matrix°TV60 with <br /> Thatch synthetic turf system with the following installed options: <br /> • All soccer lines tufted or inlaid in white turf <br /> • Proprietary "RealFill" (patent no. 6,800,339 B2) installation of selectively <br /> graded aggregate and SBR rubber <br /> • Supply one (1) ground-driven tow-behind maintenance machine <br /> • Powered vehicle for pulling equipment not included. <br /> • Gmax testing @ <110 at time of installation <br /> • Provide 8-year manufacturer warranty <br /> • Provide third party insured warranty <br /> After synthetic turf installation is complete, Hellas will provide an operation <br /> and maintenance orientation for care of the turf field, and all of the supplied <br /> equipment quoted above. <br /> Base Price $517,630.00 <br /> ® BASE PROPOSAL - Pelican Park <br /> Hellas will: <br /> 1. Provide construction site access at double gate at southeast corner of field. <br /> 2. Excavate to required subgrade elevation, haul off and properly dispose of all <br /> excavated materials. <br /> 3. Proof roll subgrade to check for soft spots, grade and compact to proper planarity <br /> and density. <br /> 4. Construct approximately 710 lineal feet of 6" x 12" continuously reinforced <br /> concrete curb at the perimeter of the synthetic turf area, inside the existing chain <br /> link fence, at the pitcher's mound and the home plate circle. <br /> (Pitcher's mound and home plate circle to remain in existing clay materials. <br /> 5. Provide and install 2" x 4" pressure treated wood nailer at new perimeter curb. <br /> 6. Provide and install Mirafi 140N geotextile fabric (or approved equal) over <br /> subgrade. <br /> 7. Provide and install 1" x 12" J-Drain MVP panel drains over subgrade at 20' on <br /> center. <br /> 8. Provide and install 4 inch layer of#57 stone, 1 inch layer of#89 stone and 1" <br /> layer of washed screenings; each layer laser graded and compacted to proper <br /> planarity and density. <br /> 9. Provide and install approximately 39,926 square feet of Brock SP14 Shock Pad. <br /> ® AMERICAN <br /> LDERS <br /> MEMBER SPORTS BUI <br /> \ ASSOCIATION <br /> O <br /> 0 <br /> • <br /> WWW.HELLASCONSTRUCTION.COM <br /> Hellas Construction.Inc. RFP#12-10M3 P.83 <br />
The URL can be used to link to this page
Your browser does not support the video tag.