Laserfiche WebLink
1 <br /> 3) The flanged edge of a GeoFlo roll must always butt with an un-flanged edge. Where two flanged edges meet due to slope <br /> transitions. such as at the crown of the field,one flange edge must be trimmed and removed to prevent a gap in the plane <br /> of the GeoFlo surface. <br /> 4) The GeoFlo will consist of a high density, cupsated core, covered with a needle punched non-woven geotextile on the <br /> top. <br /> 5) Total weight of blanket will be a minimum of 24 oz./sv and capable of accepting a compressive load of 20,000 psi, <br /> without crushing and while maintaining measurable flow. <br /> 6) The GeoFlo will have a core incorporating expansion joints every 4 feet. The shock pad and drainage blanket so <br /> constructed, must provide a complete underlayment, over the entire field area, when mechanically bound with <br /> mechanical tape: and must not wrinkle, wave. float,buckle or otherwise disturb the planarity of the artificial turf surface, <br /> even under the most elevated conditions for thermal expansion to be experienced at the site. <br /> 7) The thickness of the blanket will be a minimum of 0.5 inch. <br /> C. REPLICATED GRASS INSTALLATION: <br /> 1 I) The replicated grass will be installed along the length of the field and cover the full width as shown in the engineering <br /> drawings. The carpet rolls are to be installed directly over the properly prepared dynamic drainage blanket base. Extreme <br /> care should be taken to avoid disturbing the shock pad. The full width rolls shall be laid out across the field. Utilizing <br /> standard state-of-the-art bonding procedures, each roll shall be attached to the next. When all of the rolls of the playing <br /> surface have been installed. the sideline areas shall be installed at right angles to the playing field turf. Turf shall be <br /> attached,by industrial rustproof staples directly to wood nailer,around perimeter of field at maximum three-inch(3 inch) <br /> intervals. <br /> 2) The replicated grass rolls shall be installed so that tufted lines are placed as shown on manufacturer's drawing, which <br /> drawing shall be pre-approved by Purchaser prior to manufacture of replicated grass. The same drawing shall also show <br /> ' location of all optional in situ permanent lines or markings. <br /> 3) Immediately after brushing with a motorized rotary nylon broom, the blended infill material shall be spread evenly by <br /> using a drop or broadcast spreader(minimum 5 foot wide), in multiple applications, each no more than 15% of the total <br /> application, at a uniform rate. Between applications, and just prior and subsequent to infilling the area shall be brushed <br /> with the motorized broom. Infill depth will be I inch (1.0°+/- 0.1'), infill material to be uniformly incorporated into the <br /> replicated grass system. <br /> PROJECT CLOSEOUT/WARRANTY: Upon final acceptance or first use of the finished sports field (whichever occurs <br /> ' first)the Geo-Surfaces Warranty becomes effective,which warranty shall be the only warranty obligation by Geo-Surfaces to <br /> the Owner. <br /> 1 <br /> 1 <br /> 1 <br /> 1 <br /> 1 Global Synthetics Environmental.LLC • 6326 Highland Road • Baton Rouge.LA 70808 • 225.907.4763• www.Qeosurfaces.com 9 <br /> #12-10-03 <br /> 1 <br />