Laserfiche WebLink
1 <br /> 1 The replicated grass surface shall demonstrate by independent,certified laboratory testing: <br /> • A minimum average Tuft-Bind(ASTM D-1335)of 8 lbs/force. <br /> 1 • A minimum breaking strength (ASTM D-2256)of 420/250(x and y direction)lbs/force. <br /> • An initial CI-Max (ASTM F-355-A) for the GeoGreen replicated grass of not more than 110 when installed in <br /> conjunction with the GeoFlo shock pad and dynamic drainage blanket. <br /> 1 <br /> IIL INSTALLATION <br /> 1 A. BASE CONSTRUCTION—TURF INSTALLATION: <br /> 1 Specific design criteria must include the following: <br /> I) The sub-base must slope a minimum of 1/2%(to a maximum of 1%)to the collector drains. <br /> 1 2) After sub-base has been properly graded, contoured and sloped as required, it shall be compacted using a three to ten ton <br /> vibratory roller, as close as possible to 95% Proctor Density. <br /> 3) Additional stone, cement or recycled materials may be installed as is necessary to attain specified finished grade <br /> 1 tolerances. Such materials should be compactable enough to provide a stable grade for installation of the turf and fine <br /> enough to allow for specified grade tolerance. These additional materials shall be graded to 1/4 inch in 10 feet tolerance, <br /> and compacted. <br /> 1 4) Finish grading equipment should consist of dual-plane laser-actuated box grader or small mini-grader. Large road <br /> graders can be used but are not recommended in all situations. Grading equipment that is not hydraulically-actuated by <br /> laser is also not recommended. <br /> 1 5) A minimum 6-inch wide x 12-inch deep concrete curb shall be excavated at the precise perimeter of the synthetic grass <br /> installation area. The curb shall be constructed with concrete (min. 3000 psi) to a uniform specified grade with a grade <br /> tolerance of no more than %.' grade deviation under a 10 foot straight edge. After cure time, a 1.25 inch x 4 inch treated <br /> 1 nailer shall be installed to specific perimeter line, by ramset or TapCon, to the newly installed and/or existing concrete <br /> anchor. The finished grade of the nailer shall match the perimeter-finished grade of the aggregate base. <br /> 1 6) To the inside of the concrete anchor a trench drain shall be installed. The trench drains shall contain flexible, perforated <br /> pipe as shown in the engineered design and shall be filled with '/."/." inch clean, fractured stone as is typical. Drains <br /> shall be properly graded to insure positive flow of water to outflow. The drains shall be tied in to the existing outflow <br /> drains. <br /> 1 B. GEOFLO SHOCK PAD AND DYNAMIC DRAINAGE BLANKET INSTALLATION: <br /> I) Global will use an electronic or staked grade grid, of not more than 25 feet separation, to establish finished grade of <br /> 1 stone base, before installing the GeoFlo blanket. Stone base should not deviate from specified finish grade by more than <br /> 1/4 inch under ten feet straight edge. <br /> 1 2) Blanket will be installed along full end-to-end length of the field, perpendicular to the direction of slope. The 4 feet or 8 <br /> feet wide rows should be installed starting at the crown (or highest grade elevation) and 'shingled' toward the lowest <br /> grade elevation (the protruding flange will be placed on the highest elevation side, and the flanged edge of the <br /> subsequent roll will be inserted completely under the un-flanged edge of the preceding row). The installation of the rows <br /> 1 of GeoFlo will continue in this manner until over the open stone of the perimeter collector drains,where a 2'wide row of <br /> pervious (perforated) GeoFlo will be placed, in the same manner. The GeoFlo row nearest the collector drain will be <br /> trimmed in width(from the un-flanged edge)to allow precise fit of a 2 feet wide pervious GeoFlo,to anchorage line. The <br /> 1 rows of GeoFlo will be bonded and moisture sealed, using a pressure-sensitive tape or Not Melt Glue, as supplied by <br /> Global, on all seams. All seams will be sufficiently tight to leave no gaps or irregularities that could reflect through the <br /> synthetic grass surface, however, care should be taken to maintain a minimum 1/4 inch separation to allow for thermal <br /> expansion. The drainage blanket may be temporarily held in place by stapling to wood nailer,even' few feet. <br /> 1 Global Synthetics Environmental.LLC • 6326 Highland Road • Baton Rouge.LA 70808 • 225.907.4763• www.oeosurf aces.com 8 <br /> RFP#12-10-03 <br /> 1 <br />