My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Pro Grass
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFP
>
RFP No. 12-10-03 Artificial Turf for Senator Gwen Margolis and Pelican Community Parks
>
Responses
>
Pro Grass
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/13/2012 3:16:20 PM
Creation date
12/13/2012 3:02:43 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Artificial Turf for Gwen Margolis & Pelican Community Parks
Bid No. (xx-xx-xx)
12-10-03
Project Type (Bid, RFP, RFQ)
RFP
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
136
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> ProGrass <br /> ' First in Turf <br /> 1 <br /> RFP No. 12-10-03 <br /> 1 City of Sunny Isles Beach <br /> 18070 Collins Avenue <br /> Sunny Isles Beach, Florida 33160 <br /> RE: Section #5- Cost of Services for design, permitting, supply and construction of RFP No. 12- <br /> a 10-03 <br /> 1 Gwen Maroolis Park <br /> Base proposal $ 466,600.00 <br /> Voluntary Alternates: <br /> 1) Provide an eight year insured warranty in addition to the ten year standard <br /> warranty $ No Charge <br /> 2) Provide a concrete curb 6" x 8" with a wood nailer in lieu of a wood edge detail <br /> $ 17,024.00 (add to base bid) <br /> 3) Start project in the spring , March 1, 2013 in lieu of the projected start date of June 1, <br /> 2013 $5,000.00(deduct from base bid) <br /> 1 4) Provide a 40 oz. pile weight in lieu of base bid 38 oz. $ 2,407.00 (add to base bid) <br /> 5) Remove the pad entirely from the synthetic turf system <br /> $ 52,333.00(deduct from base bid) <br /> Pelican Community Park <br /> Base proposal $ 376,440.00 <br /> Voluntary Alternates: <br /> 1) Provide an eight year insured warranty in addition to the ten year standard <br /> warranty $ No Charge <br /> 2) Provide a concrete curb 6" x 8" with a wood nailer in lieu of a wood edge detail <br /> $ 11,179.00 (add to base bid) <br /> 1 3) Start project in the spring , March 1, 2013 in lieu of the projected start date of June 1, <br /> 2013 $5,000.00(deduct from base bid) <br /> 4) Provide a 40 oz. pile weight in lieu of base bid 38 oz. $ 1,728.00 (add to base bid) <br /> ProGrass, LLC <br /> 1 960 Penn Avenue, 8th Floor • Pittsburgh, DA Ic», • 419 414 <nn) • Toll-Free 866.270.6003 • Fax 412.391.2270 <br /> ProGrass RFP No. 12-10-03 103 <br />
The URL can be used to link to this page
Your browser does not support the video tag.