Laserfiche WebLink
Pro Grass <br /> First in Turf <br /> i <br /> 5) Remove the pad entirely from the synthetic turf system <br /> $ 35,475.00(deduct from base bid) <br /> 1 <br /> 1 Total Combined Base Proposal $ 843,040.00 <br /> The above Base Bid Cost of Services does not include: allowances, over excavation, soil <br /> stabilization, rock excavation, and unsuitable soils. The base bid includes wood edge detail, no <br /> detention system, and utilizing (connecting) existing storm water drainage system. These <br /> concerns, if applicable, will be addressed by a pre-approved owner change order. <br /> The synthetic turf Pro Grass LLC is proposing is a Pro Grass Blend 1.75" (50% monofilament <br /> fibers and 50% parallel slit film fibers) with a 5mm pad and an all ambient rubber infill. <br /> 1 <br /> Sincerely Submitted , <br /> 'nee, Q <br /> Mark r Oran <br /> Vice President of Management Operations <br /> 1 <br /> 1 <br /> 1 <br /> 1 <br /> ProGrass, LLC <br /> 960 Penn Avenue, 8th Floor • Pittsburgh, on I c,11 . as end' cnnz • Toll-Free 866.270.6003 • Fax 412.391.2270 <br /> ProGrass RFP No. 12-10-03 104 <br />