Laserfiche WebLink
ProGrass <br /> First in Turf <br /> 1 <br /> Joe Kovach <br /> • 4 years experience with the architectural design of synthetic turf playing <br /> fields. <br /> • Managed synthetic turf installations in six different states. Projects include <br /> colleges and high schools. <br /> • Project Management of over 45 artificial turf mulled installations from 2006 <br /> to present day. <br /> John Rombold <br /> • 5 years' experience with the architectural design of synthetic turf playing <br /> fields. <br /> • 14 years' experience in construction management: responsible for <br /> construction scheduling, labor coordination, draftsman supervision for <br /> developing work drawings in commercial projects. <br /> • Managed synthetic turf installations in fifteen different states. Projects <br /> include colleges and high schools. <br /> I • Project Management of over 50 artificial turf in-filled installations from 2007 <br /> to 2011. <br /> I <br /> Nicholas Boding <br /> t • 4 years experience with architectural design of synthetic turf playing fields. <br /> • 4 years expierence in construction management: responsible for <br /> 1 construction scheduling, labor coordination, draftsman supervision for <br /> developing work drawings in commercial projects <br /> • Managed synthetic turf installations in 12 different states. Projects include <br /> 1 Division 1 colleges and high schools. <br /> • Project Management of over 20 artificial turf installations from 2008 to <br /> present day. <br /> ProGrass, LLC <br /> 960 Penn Avenue, 8th Floor • Pittsburgh, oe i c». . 41, aza annz • Toll-Free 866.270.6003 • Fax 412.391.2270 <br /> ProGrass RFP No. 12-10-03 43 <br /> • <br />