Laserfiche WebLink
I <br /> Martin Rossi, PSM <br /> sk 44 , i Senior Surveyor <br /> /, Professional Experience: sewer transmission system and <br /> I -g-1 .' stormwater system, construction/ <br /> Mr. Rossi is a Senior Surveyor with contract administration and public <br /> significant experience in all types of land information, permitting of the water, <br /> surveying,drafting,and field sanitary sewer,drainage and roadway <br /> Icoordination. He is currently responsible improvements, preparation of bidding <br /> Years of Experience:33 for managing the Survey computer-aided documents,as well as the design of <br /> design (CAD) Department in the South landscaping, irrigation and entry sign <br /> I Years With the Firm:27 Florida Office. Mr. Rossi also is an <br /> Associate of the firm. features for the neighborhood. Services <br /> provided by Miller Legg also include <br /> Registrations&Certifications: • control surveys for aerial photography- <br /> Regained <br /> Relevant ElJippec FL 1998 Relevant Project Experience: tied United States geological survey <br /> 1001 itiareaaare of heir (USGS)monumenration,right-of-way <br /> Pelican Community Park-A three- surveys,topographic surveys, South <br /> Professional &Civic Activities: acre active park site, for which Miller Florida Water Management District and <br /> Legg managed landscape architecture. Broward County Department of Urban <br /> P.m Mire hearten Florida Surveying& napping Society. - irrigation,engineering, surveying and Planning and Redevelopment surface <br /> Broward Chapter architecture designs for a baseball field, <br /> gin water permitting. Florida Department of <br /> recreation building, playground Transportation permitting and design of <br /> I structure,gymnasium, and related site <br /> amenities within the City traffic calming elements. Miller Legg <br /> City of Sunny Isles assisted Broward County in obtaining <br /> Beach. The project management team at approval for two grants, $4 million and <br /> Miller Legg received recognition from $1.8 million, respectively, from the <br /> I the City for their involvement in the Federal Emergency Management Agency <br /> design completion of the park. In (FEMA)for the drainage improvement <br /> addition, Miller Legg provided portions of the project. <br /> I construction observation services. In <br /> addition,we also provided grant Miramar Parkway LAP Streetscape <br /> assistance to secure a Florida Improvements from 62nd to 64th <br /> Recreational Development Assistant Avenue- Miramar Parkway Streetscape <br /> I Program (FRDAP)grant for$200,000. Improvement project is a Local Agency <br /> FRDAP is a competitive grant program Program (LAP)-funded revitalization <br /> that provides financial assistance to local project in the City of Miramar. The <br /> governments'for development or project entails Miramar Parkway's <br /> I acquisition of land for public outdoor eastern gateway segment from 62nd to <br /> recreational purposes. Award'Award of 64th Avenue. The project includes <br /> Merit,American Society of Landscape intersection improvements,traffic signal <br /> I Architects, Florida Chapter, 2009 modifications/upgrades and sidewalk and <br /> landscape beautification throughout the <br /> North Andrews Gardens project limits. Services provided include: <br /> Neighborhood Improvement surveying including topographic <br /> I Project-A 730-acre community, surveying, maintenance of traffic, <br /> containing approximately 30 miles of underground utility designation, <br /> roadway, located in unincorporated landscape architecture, hardscape design. <br /> I Broward County.Services provided in drainage and stormwater permitting, <br /> the first phase of the project included:a design and management,lighting and <br /> Basis of Design Report(BODR) that electrical design,geotechnical design, <br /> evaluated the existing conditions and traffic engineering, tree permitting and <br /> I recommended engineering and landscape arborist services, as well as LAP <br /> architecture solutions.The design and coordination, permitting and submittal <br /> construction administration portions of documentation. <br /> the project include the design, modeling <br /> of water distribution system,sanitary • <br /> I _ ProGrass RFP No. 12-10-03 49 <br />