Laserfiche WebLink
IMartin Rossi, PSM <br /> I Memorial Hospital West crypts, columbarium, cremains sites, atlas. Miller Legg was a subconsultant to <br /> Emergency Room Expansion - Miller roadways, irrigation, utilities, surveying, The Haskell Company. <br /> Legg provided engineering, landscape, landscaping, administration building, <br /> irrigation, specialty paving and site maintenance building, and signage. Davie Surveying Services -Various <br /> I amenity designs from concept through surveys on a continuing basis for the <br /> construction document and construction School Board of Broward County Town of Davie, including right-of-way, <br /> administration phases for the Emergency Surveying Services - In conjunction topographic,as-built, and boundary <br /> I Room Expansion Building, pedestrian with the School Board of Broward surveys. <br /> plaza and parking garage at Memorial County, provided surveying services on <br /> West Hospital in Pembroke Pines. Due more than 50 school sites in Broward Manheim Auto Auction Miami <br /> to the high use of the emergency room County over the past 17 years.The Gardens- For this 160-acre site in the <br /> I facilities by visitors to the hospital, Miller services for these projects have included: City of Miami Gardens just south of the <br /> Legg staff created a clear and safe architectural design surveys, Broward/Miami-Dade County line. Miller <br /> pedestrian connection between the construction layout including buildings, Legg has provided services including:civil <br /> I parking and the main building entrance Subsurface Utility Engineering(SUE), and traffic engineering design and <br /> and used green space areas landscaped parking and driveways, as-built surveys, permitting, platting, boundary and <br /> with colorful tropical plantings to boundary,horizontal and vertical topographic surveying,identifying corner <br /> separate the pedestrian users from control,topographic, as-built surveys, records, site planning,tree permitting, <br /> I adjacent vehicles.Miller Legg also right-of-way surveys for signalization landscape architecture and irrigation <br /> designed a large welcome plaza in the design, and preparation of legal design,environmental consulting, <br /> front of the building that includes raised descriptions. environmental permitting and <br /> seating wall planters, shade trees, construction observation.This site is <br /> I geometric paving patterns and benches West Lake Park I - Engineering unique in that it is an old landfill for the <br /> to be used by visitors and staff to relax Services - Phase one of this 1,500-acre Town of Surfside in Miami-Dade County. <br /> during breaks. award-winning environmental park and It has been closed for years and <br /> I nature center in Hollywood. Services environmental remediation has occurred <br /> Memorial Regional Hospital provided included:paving and drainage on the site. <br /> Surveying- For this regional hospital improvements for the nature center and <br /> located in Hollywood, Florida. Miller associated parking lot,design of three <br /> I Legg provided on-going surveying efforts <br /> including as-builts sewage pump stations,water distribution <br /> a for structural design, system design,sanitary sewage collection <br /> topographic surveys, construction layout and transmission system design, off-site <br /> I and final site survey for the hospital's force main,traffic engineering, surveying. <br /> continued expansion efforts. We were a environmental mitigation and design, and <br /> subconsultant to Skanska USA Building, restoration of mangrove preservation <br /> Inc. areas. Award:Engineering Excellence <br /> Award,American Council of Engineering <br /> Sarasota National Cemetery-With Companies, 2004 <br /> nearly one fifth of Florida's 1.9 million <br /> military-service veterans living within 75 Westside Regional Medical Center <br /> I miles of Sarasota.the U.S. Department Surveying-Performed a boundary and <br /> of Veterans Affairs(VA) has designated a topographic survey for above ground <br /> 300-acre site, comprised primarily of improvements,a 23-acre site survey, <br /> I agricultural lands,to serve as the infrastructure as-builu,and review of the <br /> Sarasota National Cemetery. Miller Legg tide exceptions at this regional hospital <br /> provided the necessary services for in Plantation. <br /> master planning and design development <br /> I for this new National Cemetery. The Miami Dade College (MDC) <br /> firm also performed surveying, Hialeah Campus Parking Garage <br /> permitting, construction document Utility Survey- For use in design and <br /> preparation and construction period construction of a future parking garage at <br /> I services. The design documentation for the Miami Dade Hialeah Campus <br /> _ the Phase I build-out covered location, Miller Legg provided updated <br /> approximately 100 acres of the site. boundary and topographic surveys that <br /> I Included as part of the design were included tree identification, tide review <br /> environmental mitigation, main entrance chart and utility atlas created with full <br /> - area,assembly area, public information SUE services. These services included: <br /> center,committal service shelters,full- utility research,designation, locates and <br /> Icasket grave sites containing pre-placed mapping for preparation of campus utility <br /> `, <br /> IProGrass RFP No. 12-10-03 50 <br />