Laserfiche WebLink
I . <br /> I _ Christopher Holmes, PE <br /> I Engineer <br /> f <br /> ,5:t: <br /> # Professional Experience: of artificial turf for the surfaces of the <br /> LQ j site required special design <br /> _ �'' Mr. Holmes has been responsible for considerations. The possibilities of <br /> design and production for a wide variety future expansion,as described by the <br /> '�, of public and private sector civil overall master plan,were taken into <br /> 4(E engineering projects.As Project account during the design phase of the <br /> Engineer, he has been responsible for project Coordination with all <br /> Years of Experience: 13 water distribution systems, sanitary stakeholders of the facility was also an <br /> 1 sewer and stormwater design and important factor of the design phase. <br /> Years With the Firm:8 modeling, site grading and various agency Services provided included: design <br /> permitting. He also is an Associate of survey, topographic and tree surveys, <br /> Registrations&Certifications: the firm. gopher tortoise and burrowing owl <br /> Regirread P�afauw/Eegmm FL 2007 surveys, landscape architecture design, <br /> ••• Mr. Holmes was previously project tree removal and relocation plans, <br /> Education: engineer with other large Florida-based irrigation design, lighting design. <br /> engineering consulting firms in Palm complete site engineering services, <br /> 6ardebv of ideate.Ciro Engineering Beach County.Sum Unireniry, 1999 ty' complete construction plans, regulatory <br /> agency permitting, bidding assistance,and <br /> Relevant Project Experience: construction observation and inspection. <br /> Continuing Education: P <br /> I fES Smrm.aer Maaagemear Designer's Coarse,laonry 2005 <br /> Jessica Clinton Park-A 20-acre <br /> Florida Atlantic University(FAU) community park located in the City of <br /> Professional&Civic Activities: Stadium Design-FAU constructed a <br /> g Port St. Lucie. Miller Legg teamed with <br /> I dander,American Society of Civil Engineer <br /> 30.000 seat football stadium on their The Collage Companies and the project <br /> Member.Florida Engineering Society.Pain Beach Chapter Boca Raton campus. Working with was delivered using the design/build <br /> Schenkel Shultz/HKS Architects. Miller process.This facility provides active <br /> I Legg provided civil engineering, recreational opportunities that include <br /> surveying,environmental,and irrigation two lighted baseball fields, a <br /> design. The project included the design soccer/multi-use field. basketball and <br /> and permitting for various master utility tennis courts. Passive recreation <br /> I systems for the site such as water elements include a picnic area <br /> distribution,fire protection system, playground and fitness trail.The park has <br /> sanitary sewer collection,and a maintenance building and public <br /> stormwater collection. In addition, the restrooms. Miller Legg prepared the <br /> I design incorporated a 5,000 SF Storm Water Pollution Prevention Plan <br /> commissary building,access roads,bus (SWPPP)and processed the Noticeof <br /> parking,and VIP drop-off area to Intent(NOI)for National Pollution <br /> I accommodate the stadium events. Discharge Elimination Standards <br /> Working with Balfour Beatty/ (NPDES) permitting. <br /> Cummings Construction. Miller Legg <br /> provided construction administration Carlin Park Sewer Improvements - <br /> I services to help accommodate a very Professional services for this Palm Beach <br /> aggressive construction schedule. County regional park include <br /> engineering services necessary to <br /> I Florida Atlantic University(FAU) Boca provide sanitary sewer improvements to <br /> Raton Campus Track and Field -Miller the existing and all future planned <br /> Legg completed the design development restrooms within the Park on the west <br /> and final construction design for the side of SR A I A in West Palm Beach. <br /> I reconstruction of the existing track and• field on the Boca Raton campus. This includes utility coordination and <br /> preparation of conceptual alternatives, <br /> Elements of this project included a new preliminary engineering plans and <br /> parking area,walkways,fencing and regulatory agency coordination, <br /> `�� stormwater retention facilities. The use topographic survey,geotechnical <br /> IMILLER EGG <br /> p ProGrass RFP No. 12-10-03 51 <br />