My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Pro Grass
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFP
>
RFP No. 12-10-03 Artificial Turf for Senator Gwen Margolis and Pelican Community Parks
>
Responses
>
Pro Grass
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/13/2012 3:16:20 PM
Creation date
12/13/2012 3:02:43 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Artificial Turf for Gwen Margolis & Pelican Community Parks
Bid No. (xx-xx-xx)
12-10-03
Project Type (Bid, RFP, RFQ)
RFP
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
136
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> Christopher Holmes, PE <br /> I services, electrical design, preparation of Riverbend Park-One of Palm Beach area and parking. Miller Legg designed <br /> construction plans and specs, regulatory County's naturally beautiful parks offers the park expansion consisting of three <br /> agency permitting,and bidding assistance. 648 acres of passive recreational regulation-sized soccer fields, 205 <br /> I opportunities included hiking, biking, additional paved parking spaces and a <br /> John Prince Park Campground equestrian, canoeing, picnicking and restroom building.The soccer fields will <br /> Improvements -This Park is educational activities.The park has the be equipped with sports lighting in order <br /> approximately 48 acres and has been following special facilities: interpretive to facilitate nighttime play. Miller Legg <br /> I operated by Palm Beach County since center,farmstead village,Seminole prepared the Storm Water Pollution <br /> the mid-1960's. The campground has village, special events area and a Prevention Plan (SWPPP)and processed <br /> 265 camp sites,four restroom buildings historical re-enactment area.Specialized the Notice of Intent(NOI)for National <br /> with showers, several playground area master planning was required to achieve Pollution Discharge Elimination <br /> I and other miscellaneous recreational a balance between the environment, Standards(NPDES) permitting.The total <br /> activity elements. Miller Legg prepared historical significance and recreation project site is approximately 13 acres. <br /> design plans and permitting to replace <br /> I the existing water distribution system, Seminole Colony Drainage Study- Osprey Point Golf Course (South <br /> septic system electrical system and This project included the study, design County Regional Park) - Palm Beach <br /> replace with new water,gravity and regulatory agency permitting for the County Parks and Recreation contracted <br /> wastewater systems. The electrical construction of a 36-inch pipe to replace Miller Legg to develop a presentation to <br /> 1 distribution system was removed and an existing drainage ditch serving a I/4 aide in the procurement of a water use <br /> replaced by a proposed underground square mile area.This project included permit from SFWMD in order to <br /> electrical distribution system. Each the analysis of individual site drainage operate a 27-hole golf course. Miller <br /> 1 campsite was provided with a 100-amp systems discharging the master system Legg pursued Audubon Certification for <br /> electrical service,water and sewer,all at owned and maintained by Northern Palm the golf course and it has been officially <br /> one convenient location. In addition, Beach County Improvement District. designated a Certified Audubon <br /> street lighting was designed throughout The project also included the relocation International Classic Sanctuary, the first <br /> I the campground,primarily at street of water and sewer mains to in Florida, second in the United States <br /> intersections. Electrical services were accommodate the construction of the and fifth in the world. Miller Legg aided <br /> also provided at each existing restroom new drainage trunk line. Regulatory in identifying ways for the site to use less <br /> facility, each proposed lift station, ranger Agency permitting with SFWMD, water. Miller Legg revised the golf <br /> I residence and the existing office building. NPCID, Palm Beach County Water course plans to apply low-impact <br /> In addition, the firm assisted with utility Utilities, Palm Beach County Health development techniques for stormwater <br /> coordination.This project required Department and the USACOE was management, including bioswales and <br /> I coordination with South Florida Water required. infiltration trenches. Miller Legg also <br /> Management District. Lake Worth worked with the County to enhance the <br /> Drainage District, City of Lake Worth McChesney Park Soccer Field overall landscape design and create <br /> Utilities and Palm Beach County Health Expansion-An existing active natural corridors for wildlife. <br /> I <br /> Department. recreational facility with two regulation- <br /> sized soccer fields. <br /> concession/maintenance buildings, play <br /> I <br /> I <br /> I <br /> 1 <br /> I <br /> I ProGrass RFP No.12-10-03 52 <br /> • <br />
The URL can be used to link to this page
Your browser does not support the video tag.