Laserfiche WebLink
RFP# 12-10-03 <br /> ø4k4aLJQp� ` Quote# 1212-212 <br /> Artificial Turf for Senator Gwen Margolis and Pelican Community Parks <br /> City of Sunny Isles Beach <br /> Date: December 12, 2012 <br /> RE: Request for Proposal No. 12-10-03 <br /> Quote: 1212-212 <br /> The following is a proposal by Medallion to supply and install artificial turf at Senator Gwen <br /> Margolis and Pelican Community Parks on North Bay Road in Sunny Isles Beach, FL. Proposed <br /> work to include replacing the entire playing surface within the fenced enclosure at Senator Gwen <br /> Margolis Park with artificial turf, permanently lined for soccer play. Proposed work also includes <br /> replacing the playing surface within the fenced baseball field enclosure at Pelican Community Park <br /> with artificial turf. Upon acceptance of this proposal, Medallion will provide all materials, <br /> equipment and/or labor as outlined below. The scope of this proposal shall include the following: <br /> SCOPE OF WORK • <br /> • Professional services include initial survey, field design and layout, construction and <br /> erosion control permitting. <br /> • Supply and install required construction entrances and erosion control measures. <br /> • Medallion to excavate soil to 0.5% crown. Spoils to be relocated off-site. <br /> • Medallion to fine grade sub-base at proposed artificial turf areas only. Sub-base to be <br /> quality assured with proof roll. <br /> ® • Medallion to install collector pipe at perimeter of turf areas (Assumes that Medallion can <br /> tie into existing storm drain within 50ft of each field). <br /> • Supply and install non-woven fabric over entire sub base and under perimeter trench <br /> drains at fields. Back-fill trenches with stone. <br /> • Install concrete curb and nailer board at perimeter of each field. <br /> • Supply and install Safety Curbing along perimeter of pitching mound and batter's box at <br /> baseball field. These areas are to remain day soil. <br /> • Supply and install layers of 2"and 4" laser graded stone base at each field. <br /> • Supply and install 20mm Sport Drain Max shock and drainage pad over stone base <br /> • Install approximately 55,750sgft of Shaw Sports Turf Powerblade Elite 45 (1.75" pile) with <br /> combination SBR (crumb rubber) and sand infill at Senator Gwen Margolis Park. Turf <br /> color to be chosen from standard color line. <br /> • Supply and install inlaid gamelines for soccer at Senator Gwen Margolis Park. Color to be <br /> determined from standard color line. <br /> • Install approximately 40,650sgft of Shaw Sports Turf Powerblade Elite 45 (1.75" pile) with <br /> combination SBR (crumb rubber) and sand infill at Pelican Community Park. Pitching <br /> mound and batter's box shall remain clay soil. Interior infield, outfield, and bordered <br /> areas shall be green turf. Infield baselines, infield foul area, and warning track shall be <br /> clay tone turf. Colors shall be chosen form standard color line. Clay tone turf color for <br /> infield, warning track, and baselines shall be chosen from standard color line. <br /> • Supply and install inlaid gamelines for baseball at Pelican Community Park. Color to be <br /> determined from standard color line. <br /> Base Bid Supply and Install: Senator Gwen Margolis Park $ 436,865.00 <br /> Base Bid Supply and Install: Pelican Community Park $ 355.930.00 <br /> • Total Base Bid Supply and Install $792,795.00 <br /> Medallion Athletic Products, Inc. • 150 River Park Road • Mooresville,NC • 28117 <br /> (P) 704.660.3000 • (F) 704.660.3001 <br /> www.medallionathletics.com 8 <br />