Laserfiche WebLink
1 <br /> I <br /> 8. Custom blended,vertically draining aggregate base layer will be installed at 6" in depth. Base <br /> layer will be laser fine graded to within Y4 inch to provide proper crown and slope. The base material <br /> design and construction are critical to provide both rapid drainage of rain water and structural <br /> stability of the turf base. 3-5 days. <br /> 9. Synthetic turf will be A Turf Titan dual fiber mulled synthetic turf system. The turf is a blend of <br /> monofilament and slit film fibers. The infill material will be a blend of sand and ambient rubber. <br /> Inlaid markings for baseball are included in this proposal. This turf is warranted for a period of ten <br /> years by the manufacturer. 14-20 days. <br /> 10. Construction of clay mound and home plate areas. 1-2 days. <br /> 11. Restoration of Ballard disturbed areas. It is assumed the existing access drives will <br /> accommodate the truck traffic required to build this project. 1-2 days. <br /> 12. Mobilization and necessary general conditions. <br /> Total time allotted=30—45 days from Mobilization through Restoration. Note:This project can be <br /> completed in conjunction with the Senator Gwen Margolis Community Park project. <br /> TERMS: 1 <br /> - This proposal is valid for a period of thirty days <br /> - All work to be performed in one mobilization <br /> - Contract to be AIA with payment due at net 15 days <br /> Ballard Sports appreciates your consideration of this proposal. If you have any questions,or would <br /> like to discuss any items or ideas please call me at 919.678.8440. <br /> PROPOSAL SUBMITTED BY: <br /> VICTOR PROCOPIO <br /> GENERAL MANAGER <br /> BALLARD SPORTS <br /> 950 SOUTH PINE ISLAND ROAD <br /> PLANTATION,FL 33324 <br /> 1 <br /> I <br /> 1 <br /> 22 I Ballard Construction, Inc. RFP No. 12-10-03 <br /> 1 <br /> 1 <br />