My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2017-2771
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2017
>
Reso 2017-2771
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/24/2019 1:59:02 PM
Creation date
12/27/2017 3:25:36 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2017-2771
Date (mm/dd/yyyy)
12/21/2017
Description
Agmt w/CGA, Inc. to Provide Const. Engineering Insp. Services for Streetlight Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> o Receive and coordinate through the EOR, interpretations and clarifications of the <br /> Contract Documents(RFI responses,plan revisions, and Work(Change) <br /> Directives prepared by the EOR).In connection therewith, assist in the review and <br /> processing of any work change directives or change orders <br /> o Receive, and coordinate processing of shop drawings,samples and other data <br /> which the Contractor is required to submit. <br /> o Perform CEI Services including field observations for compliance with plans and <br /> specifications; provide copies of observation reports to the EOR and City on a <br /> weekly basis.Make interim inspections for substantial and final completion(s)to <br /> determine, in general, if the work has been completed in conformance with the <br /> intent of the Contract Documents. <br /> o Ensure the Senior Inspector is present at all time when construction is taking <br /> place on the field as required by the FDOT/City of SIB Agreement. <br /> o Review,coordinate required revisions,and approve and payment application <br /> requests;processing of applications by City. <br /> o Attend and participate in meetings with the City, Contractor,Engineer and <br /> appropriate regulatory agencies when requested by the City and necessary for <br /> consultation and conferences in regard to construction of the project. <br /> o Receive,review and process Contractor's construction schedule(s),and schedule <br /> of values. <br /> 3. FDOT Coordination <br /> o Prepare bi-monthly construction reports as required per the FDOT/City of SIB <br /> Agreement. <br /> o Coordinate Construction Activities with Ms. Heidi Solaun the FDOT Assistant <br /> District Construction Engineer <br /> o Coordinating final inspections by FDOT as required per the FDOT/City of SIB <br /> Agreement. <br /> o Submit payment reimbursement packages to the FDOT on behalf of the City to <br /> ensure expedited reimbursement. <br /> o Coordinate contract modifications with FDOT as per the agreement between <br /> FDOT and the City of SIB. <br /> II.BASIS OF PROPOSAL <br />
The URL can be used to link to this page
Your browser does not support the video tag.