My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2017-2771
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2017
>
Reso 2017-2771
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/24/2019 1:59:02 PM
Creation date
12/27/2017 3:25:36 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2017-2771
Date (mm/dd/yyyy)
12/21/2017
Description
Agmt w/CGA, Inc. to Provide Const. Engineering Insp. Services for Streetlight Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
o Any opinion of the construction cost prepared by Calvin,Giordano&Associates, <br /> Inc. represents its judgment as an engineering professional and is supplied for the <br /> general guidance of the CLIENT since Calvin,Giordano&Associates,Inc.has <br /> no control over the cost of labor and material,or over competitive bidding or <br /> market conditions. Calvin,Giordano&Associates,Inc. does not guarantee the <br /> accuracy of such opinions as compared to contractor bids or actual cost to the <br /> CLIENT. <br /> o Any outside engineering services,studies,or laboratory testing not specifically <br /> mentioned in the Scope of Services will be the responsibility of the CLIENT.All <br /> municipal,permit,and agency fees as well as Title Certificates will be paid by the <br /> CLIENT. <br /> o Basic services outlined within this proposal shall be considered complete when <br /> the project plans are submitted to the regulatory agencies for Certification. <br /> o Calvin,Giordano&Associates, Inc. is performing the consultant services set <br /> forth in this Agreement strictly as a professional consultant to CLIENT.Nothing <br /> contained in this Agreement shall create any contractual relationship between <br /> Calvin,Giordano&Associates, Inc. and any contractor or subcontractor <br /> performing construction activities on the project,or any of CLIENT`s other <br /> professional consultants. <br /> o Calvin,Giordano&Associates, Inc.shall not be responsible for the contractor's <br /> schedules or failure to carry out the construction in accordance with the <br /> construction documents. Calvin,Giordano&Associates,Inc.shall not have <br /> control over or charge of acts or omissions of the contractor,subcontractors,or <br /> their agents or employees,or of any other persons performing portions of the <br /> construction. <br /> o Calvin,Giordano &Associates, Inc. will require that all consultants carry proper <br /> insurance,including professional liability insurance, if appropriate. <br /> o Permit construction certification will include one partial and one final inspection. <br /> III. ADDITIONAL FEES: The following services are NOT included in this proposal and will <br /> be considered Additional Services,which will be addressed in a separate contractual agreement. <br /> The services include but are not limited to: <br /> o Architectural,structural (i.e.,retaining walls,bridges,and docks),mechanical <br /> (i.e.,fire pumps),fire protection,geotechnical and testing, environmental <br /> assessment,power, gas,telephone, cable television, site lighting services. <br />
The URL can be used to link to this page
Your browser does not support the video tag.