My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Perkins & Will
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(17-12-01) Professional Arch Srvcs Interior Remodel Govt Ctr Lobby and Gateway Park Internal Space Build
>
Responses
>
Perkins & Will
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2018 4:42:57 PM
Creation date
1/9/2018 4:42:29 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
PROFESSIONAL ARCHITECTURAL SERVICES
Bid No. (xx-xx-xx)
17-12-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
163
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PERKINS +WILL <br /> City of Sunny Isles Beach 18070 Collins Avenue,Sunny Isles Beach,Florida 33160 <br /> (305)947-0606 phone(305)949-3113 Fax t ' <br /> 3.3 DESIGN DEVELOPMENT PHASE <br /> (1) The Architect shall prepare the Design Development Documents from the approved <br /> Schematic Design. The Design Development Documents shall consist of drawings <br /> and other documents, including specifications, to fix and describe the size and <br /> character of the entire Project as to kinds of materials,type of structure,mechanicals. <br /> and electrical systems,and other work that may be required for construction of the <br /> project. <br /> (2) During the preparation of the Design Development Documents, the Architect will <br /> meet with the Owner's Project Director, representatives of Miami-Dade County <br /> School District,Building Official,or other designated representatives of Owner,to <br /> determine specific and detailed requirements of all spaces in the proposed building " <br /> and surrounding site requirements. The mechanical and electrical systems to serve <br /> the building shall be determined during this period and shall be described in the a = <br /> Design Development Documents. <br /> 3.4 CONSTRUCTION DOCUMENTS PHASE <br /> (1) The Architect shall prepare, from the approved Schematic Design Phase ,.°. <br /> Documents, Contract Documents consisting of Drawings and Specifications and <br /> setting forth in detail the quality levels of materials and systems and other <br /> requirements for the Contractor's construction of the Work. <br /> (2) The non-technical documents consisting of the necessary bidding information, <br /> General Conditions of the Contract, including any Supplementary Conditions, <br /> proposal and contract form shall be prepared by Owner. The Architect shall review <br /> and provide the Owner his comments on these documents. Such documents shall <br /> not place any responsibility or obligation on the Architect that are not already in <br /> this contract. <br /> (3) The Architect shall provide and distribute 10 hard (paper) copies and one (1) <br /> electronic copy of the Contract Documents for each Bid Group for review and <br /> comment, including the non-technical documents, as directed by the Project <br /> Director. <br /> C1415- PERKINS&WILL ARCHITECTS INC. 4 <br /> 132 Sunny Isles Government Center Lobby+Gateway Park Build-Out <br />
The URL can be used to link to this page
Your browser does not support the video tag.