My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Perkins & Will
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(17-12-01) Professional Arch Srvcs Interior Remodel Govt Ctr Lobby and Gateway Park Internal Space Build
>
Responses
>
Perkins & Will
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2018 4:42:57 PM
Creation date
1/9/2018 4:42:29 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
PROFESSIONAL ARCHITECTURAL SERVICES
Bid No. (xx-xx-xx)
17-12-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
163
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1111 <br /> ® _ <br /> 1111 <br /> City of Sunny Isles Beach 18070 Collins Avenue,Sunny Isles Beach,Florida 33160 <br /> (305)947-0606 phone(305)949-3113 Fax <br /> issuance of a building permit. If after award of a building permit,modifications to the Drawings <br /> and Specifications are required because of an interpretation by the Code Authority which had not <br /> been previously given,or which if given,was different than a prior interpretation by the Code <br /> Authority,Architect shall make the required modifications,but the cost of such modifications <br /> shall be considered an Additional Service,except if the Architect had construed the interpretation <br /> incorrectly in accordance with the professional standard of care. Nothing contained herein shall <br /> relieve the Architect of its obligations to modify at its own expense Plans and Specifications <br /> which the Architect has negligently failed to prepare in compliance with the applicable <br /> Government Requirements. <br /> 3.5 BIDDING PHASE <br /> (1) The Contractor shall be responsible for administering the bidding of each Bid <br /> Group. <br /> 111 <br /> (2) The Architect shall evaluate product equals at the request of the Contractor and <br /> make a decision on each in a timely manner. <br /> (3) The Architect shall attend the pre-bid conference and bid opening for each Bid <br /> Group. <br /> (4) The Architect will assist the Contractor in evaluating all bids received and provide <br /> comment and recommendation to the Owner on each proposed authorization for <br /> work in connection with the Project. <br /> 3.6 CONSTRUCTION PHASE <br /> 3.6.1 Construction Phase — Administration of the Construction Contract Work under <br /> Contract to Contractor. <br /> (1) The Construction Phase will commence with a written authorization from the <br /> Project Director for Construction to begin and, together with the Architect's <br /> obligation to provide Basic Services under this Agreement, will terminate when <br /> final payment to the Contractor is made,or in the absence of a final Certificate for <br /> Payment or of such due date, 30 days after the date of Substantial Completion of <br /> the total Project,whichever occurs first. <br /> C1415- PERKINS&WILL ARCHITECTS INC. 7 <br /> Perkins+Will Qualifications for Architectural-Interior Design Services 135 <br />
The URL can be used to link to this page
Your browser does not support the video tag.