My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Perkins & Will
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(17-12-01) Professional Arch Srvcs Interior Remodel Govt Ctr Lobby and Gateway Park Internal Space Build
>
Responses
>
Perkins & Will
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2018 4:42:57 PM
Creation date
1/9/2018 4:42:29 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
PROFESSIONAL ARCHITECTURAL SERVICES
Bid No. (xx-xx-xx)
17-12-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
163
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PERKINS +WILL <br /> Ciry of Sunny Isles Beach 18070 Collins Avenue,Sunny Isles Beach,Florida 33160 <br /> (305)947-0606 phone(305)949-3113 Fax <br /> (2) Unless otherwise provided in this Agreement and incorporated in the Contract <br /> Documents, the Architect shall provide administration for the Construction <br /> Contract as set forth below and in the Conditions of the Contracts for Construction. <br /> as developed by the Contractor with the approval of the Architect and Owner: <br /> (3) The Architect shall be a representative of the Owner during the Construction,and <br /> shall advise and consult with the Owner. Instructions to the Contractor shall be <br /> forwarded through the Architect. The Architect shall have authority to act on behalf <br /> of the Owner only to the extent provided in the Contract Documents unless <br /> otherwise modified by written instrument in accordance with Subparagraph(18). <br /> • <br /> (4) The Architect shall provide periodic visits to the site as prescribed in Exhibit"D" <br /> to be generally familiar with the progress and the general quality of the Work and <br /> to determine in general if the Work'is proceeding in accordance with the Contract " <br /> Documents. This Exhibit"D"by reference and attachment hereto forms a part of <br /> this Agreement. On the basis of such on-site observations of the Architect, the <br /> Architect shall keep the Owner informed of the progress and the general quality of <br /> the Work,and shall endeavor to guard the Owner against defects and deficiencies <br /> in the Work of the Contractor. <br /> (5) The Architect shall not have control or charge of and shall not be responsible for <br /> construction means, methods, techniques, sequences or procedures, or for safety <br /> precautions and programs in connection with the Work,for acts oromissions of the <br /> Contractor,subcontractor or any other persons performing any of the Work,or for <br /> failure of any of them to carry out the Work in accordance with the Contract <br /> Documents. The Architect shall not be responsible for the Contractor. <br /> (6) The Architect shall at all times have access to the Work wherever it is in preparation <br /> or progress. <br /> (7) Based on the Architect's observations at the site, the recommendations of the <br /> Contractor and an evaluation of the Application for Payment, the Architect shall <br /> determine the amounts owing to the Contractor and shall issue a Certificate of <br /> Payment in such amounts,as provided in the Contract Documents. <br /> (8) The issuance of a Certificate for Payment shall constitute a representation by the <br /> Architect to the Owner, based on the Architect's observation at the site and on the <br /> data comprising the Application for Payment that.Work has progressed to the point <br /> indicated;that,to the best of the Architect's knowledge,information and belief,the <br /> 01415- PERKINS&WILL ARCH!MCI SINC. 8 C~ t f <br /> 136 Sunny Isles Government Center Lobby+Gateway Park Build-Out <br />
The URL can be used to link to this page
Your browser does not support the video tag.