My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Perkins & Will
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(17-12-01) Professional Arch Srvcs Interior Remodel Govt Ctr Lobby and Gateway Park Internal Space Build
>
Responses
>
Perkins & Will
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2018 4:42:57 PM
Creation date
1/9/2018 4:42:29 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
PROFESSIONAL ARCHITECTURAL SERVICES
Bid No. (xx-xx-xx)
17-12-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
163
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
111 <br /> City of Sunny Isles Beach 18070 Collins Avenue, Sunny Isles Beach,Florida 33160 <br /> ® (305)947-0606 phone(305)949-3113 Fax <br /> quality of Work is in accordance with the Contract Documents (subject to an <br /> evaluation of Work for conformance with the Contract Documents upon Substantial <br /> Completion,to the results or any subsequent tests required by or performed under <br /> the Contract Documents, to minor deviations from the Contract Documents <br /> correctable prior to completion, and to any specific qualifications stated in the <br /> Project Certificate for Payment); and that the Contractor is entitled to payment in <br /> the amount certified. However,the issuance of a Certificate for Payment shall not <br /> be a representation that the Architect has made any examination to ascertain how <br /> or for what purpose the Contractor has used the monies paid on account of the <br /> Contract Sum. <br /> (9) Should disagreement occur between the Contractor and Architect over acceptability <br /> of work and conformance with the requirements of the specifications and plans,the <br /> 1111 Project Director shall be the final judge of performance and acceptability. <br /> (10) All interpretations and decisions of the Architect shall be consistent with the intent <br /> of,and reasonably inferable from,the Contract Documents,and shall be in writing <br /> or in graphic form. • <br /> (11) The Architect's decision in matters relating to artistic effect shall be final if <br /> consistent with the intent of the Contract Documents. The Architect's decisions on <br /> 111 any other claims,disputes or other matters,including those in question between the <br /> Owner and the Contractor, shall be subject to claims provisions provided in this <br /> Agreement and in the Contract Documents. <br /> (12) The Architect shall recommend to the owner to reject work, which does not <br /> conform to the Contract Documents. Whenever, in the Architect's reasonable <br /> ® opinion, it is necessary or advisable to insure conformance with the provisions of <br /> the Contract Documents, the Architect shall have authority to require special <br /> inspection or testing of Work in accordance with the provisions of the Contract <br /> Documents, whether or not such work be then fabricated, installed or completed; <br /> but the Architect shall take such action only after consultation with the Contractor <br /> and Owner. <br /> (13) The Architect shall receive submittals such as Shop Drawings, Product Data and <br /> Samples from the Contractor and shall review and approve or take other appropriate <br /> action upon them, but only for the limited purpose of checking for conformance <br /> with the design concept of the Project and with the information given in the <br /> Contract Documents. Review of such submittals is not for the purpose of <br /> determining the accuracy and completeness of other information such as <br /> C1415• PERKINS&WILL ARCHITECTS INC. 9 <br /> I <br /> Perkins-Will Qualifications for Architectural-Interior Design Services 137 <br />
The URL can be used to link to this page
Your browser does not support the video tag.