My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Perkins & Will
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(17-12-01) Professional Arch Srvcs Interior Remodel Govt Ctr Lobby and Gateway Park Internal Space Build
>
Responses
>
Perkins & Will
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2018 4:42:57 PM
Creation date
1/9/2018 4:42:29 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
PROFESSIONAL ARCHITECTURAL SERVICES
Bid No. (xx-xx-xx)
17-12-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
163
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PERKINS +WILL <br /> City of Sunny Isles Beach 18070 Collins Avenue,Sunny Isles Beach, Florida 33160 <br /> (305)947-0606 phone(305)949-3113 Fax <br /> dimensions, quantities, and installation or performance of equipment or systems, <br /> which are the Contractor's responsibility. The Architect's review shall not <br /> constitute approval of safety precautions or,unless otherwise specifically stated by <br /> the Architect, of any construction means, methods, techniques, sequences or <br /> procedures. Such action shall be taken with reasonable promptness so as to cause rUd <br /> no unreasonable delay. The Architect's approval of a specific item shall not <br /> indicate approval of an assembly of which the item is a component. <br /> (14) If the Contract Documents specifically require the Contractor to provide <br /> professional design services or certifications by a design professional related to <br /> systems, materials or equipment, the Architect shall specify the appropriate <br /> performance and design criteria that such services must satisfy.The Architect shall <br /> review Shop Drawings and other submittals related to the Work designed or <br /> certified by the design professional retained by the Contractor that bear such <br /> professional's seal and signature when submitted to the Architect. The Architect <br /> shall be entitled to rely upon the adequacy, accuracy and completeness of the <br /> services, certifications and approvals performed or provided by such design <br /> professionals. <br /> (15) The Architect shall review and approve or take other appropriate action on Change <br /> Orders prepared by the Contractor for the Owner's authorization in accordance with <br /> the Contract Documents. <br /> (16) The Architect shall have authority to order minor changes in Work not involving <br /> 111 <br /> an adjustment in a Contract Sum or an extension of Contract Time and which are <br /> not inconsistent with the intent of the Contract Documents. Such changes shall be <br /> effected by written order issued to the Contractor endorsed by the Project Director. <br /> (17) The Architect, assisted by the Contractor, shall conduct inspections to determine <br /> the dates of substantial completion and final completion and shall issue appropriate t:r <br /> Certificates. <br /> (18) The Architect shall,assist the Contractor in receiving and forwarding to the Owner <br /> written warranties and related documents assembled by the Contractor. 111 <br /> (19) The extent of the duties,responsibilities and limitations of authority of the Architect <br /> as a representative of the Owner during construction shall not be modified or <br /> extended without the written consent of the Architect and the Owner. <br /> ARTICLE 4111 <br /> ADDITIONAL SERVICES OF THE ARCHITECT-ENGINEER <br /> CI415- PERKINS&WILL ARCHITECTS INC. 10 <br /> ash <br /> 138 Sunny Isles Government Center Lobby+Gateway Park Build-Out <br />
The URL can be used to link to this page
Your browser does not support the video tag.