My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Perkins & Will
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(17-12-01) Professional Arch Srvcs Interior Remodel Govt Ctr Lobby and Gateway Park Internal Space Build
>
Responses
>
Perkins & Will
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2018 4:42:57 PM
Creation date
1/9/2018 4:42:29 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
PROFESSIONAL ARCHITECTURAL SERVICES
Bid No. (xx-xx-xx)
17-12-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
163
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
11111 <br /> f <br /> City of Sunny Isles Beach 18070 Collins Avenue,Sunny Isles Beach,Florida 33160 <br /> (305)947-0606 phone(305)949-3113 Fax <br /> 4.1 For additional services requested by Owner, not within the current understanding of the <br /> Basic Services identified in this Agreement and the proposal submitted by Architect in <br /> connection with its response to Request for Qualifications ("RFQ") No. 15-04-01, the <br /> Architect shall be compensated on an hourly basis,subject to the advance written approval <br /> by the City Manager and the City Commission. Such services shall be documented in <br /> writing by Architect prior to their commencement. Such additional services, while not <br /> limited to the following,shall include: <br /> 4.2 Additional services due to significant changes in schedule or the general scope of the <br /> Project or its requirements including, but not limited to, changes in size, complexity, <br /> procurement or delivery method,or character of construction. <br /> 4.3 Revising previously approved drawings or specifications after construction documents are <br /> finalized to accomplish changes. <br /> 4.4 Providing Detailed Cost Estimates. <br /> 4.5 When required by the Owner,preparing documents for Change Orders. <br /> 4.6 Consultation concerning replacement of any work damaged by fire or other cause during <br /> construction and furnishing professional services of the types set forth in Article 3 as may <br /> be required in connection with the replacement of such work. <br /> 4.7 Arranging for the work to proceed should the Contractor default due to delinquency or <br /> insolvency. <br /> 4.8 Providing prolonged contract administration and observation of construction should the <br /> construction contract time be exceeded by more than 30 days.The Architect shall provide <br /> as a basic service limited contract administration for up to 90 days beyond the contract time <br /> due to no fault of the Architect. Limited contract administration shall be the Architect <br /> 111 representative with the most knowledge of the project attending bi-weekly site visits and <br /> responding to a reasonable amount of project communications. The Architect's services <br /> through Substantial Completion and Final Completion inspections are included as a basic <br /> service and shall not be considered as an item of prolonged contract administration and <br /> observation,regardless of when performed. <br /> ® 4.9 Revising drawings to show changes made during the construction process, based on <br /> marked up prints,drawings and other data furnished by the Contractor. <br /> C1415- PERKINS&WILL ARCHITECTS INC. 11 <br /> Perkins-Will Qualifications for Architectural+Interior Design Services 139 <br />
The URL can be used to link to this page
Your browser does not support the video tag.