Laserfiche WebLink
c3,! <br /> r <br /> I • <br /> City of Sunny Isles Beach 18070 Collins Avenue,Sunny Isles Beach,Florida 33160 <br /> (305)947-0606 phone(305)949-3113 Fax <br /> default is beyond the control of both the Architect and such subconsultant,and without the <br /> fault or negligence of either,the Architect shall not be liable for any excess costs for failure <br /> to perform and shall be entitled to an equitable adjustment of Architect's fee. <br /> 111 <br /> ARTICLE 6 <br /> 111 THE OWNER'S RESPONSIBILITIES <br /> 6.1 The Owner shall provide full information as to his requirements for the Project. <br /> 6.2 The Owner shall designate a representative authorized to act on his behalf. He shall <br /> examine documents submitted by the Architect and render decisions pertaining thereto <br /> 1111 promptly to avoid unreasonable delay in the progress of the Architect's work. He shall <br /> observe the procedure of issuing orders to Contractor only through the Architect. <br /> 6.3 The Owner shall retain a Contractor to construct the Project. The Contractor's services, <br /> duties and responsibilities will be described in the Agreement Between Owner and <br /> Contractor. The Terms and Conditions of the Owner/Contractor Agreement will be <br /> furnished to the Architect. <br /> 6.4 The Owner shall provide a certified survey of the site giving,as required,grades and lines <br /> of streets,alleys,pavements and adjoining property; rights of way,restrictions,easements, <br /> encroachments, zoning, deed restrictions, boundaries and contours of the building site; <br /> locations, dimensions and complete data pertaining to existing buildings, other <br /> improvements and trees; full information as to available service and utility lines, both <br /> 111 public and private;and test borings and pits necessary for determining subsoil conditions. <br /> 6.5 The Owner shall arrange and pay for such legal,auditing and insurance counseling service <br /> as may be required by the Owner for the Project. <br /> 6.6 If the Owner observes or otherwise becomes aware of any defect in the Project, he shall <br /> give prompt written notice thereof to the Architect and Contractor. <br /> 6.7 If the estimate of Construction Cost or Detailed Cost Estimates are in excess of any limit <br /> stated herein,the Owner may give written approval of an increase in the limit or the Owner <br /> shall cooperate in revising the Project scope or quality, or both, to reduce the cost as <br /> required. <br /> ARTICLE 7 <br /> ® C1415- PERKINS&WILL ARCHITECTS INC. 1 3 <br /> Perkins+Will Qualifications for Architectural--Interior Design Services 141 <br />