My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Perkins & Will
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(17-12-01) Professional Arch Srvcs Interior Remodel Govt Ctr Lobby and Gateway Park Internal Space Build
>
Responses
>
Perkins & Will
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2018 4:42:57 PM
Creation date
1/9/2018 4:42:29 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
PROFESSIONAL ARCHITECTURAL SERVICES
Bid No. (xx-xx-xx)
17-12-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
163
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PERKINS +WILL <br /> I I <br /> City of Sunny Isles Beach 18070 Collins Avenue,Sunny Isles Beach,Florida 33160 <br /> (305)947-0606 phone(305)949-3113 Fax <br /> CONSTRUCTION COST <br /> 7,1 DEFINITION <br /> (1) The Construction Cost shall be the total cost or estimated cost to the Owner of all <br /> elements of the Project designed or specified by the Architect. The construction <br /> cost shall not exceed the Owner's Construction Budget. The Owner's construction111 <br /> budget is set forth in Article 1 and Exhibit"B''. <br /> (2) The Construction Cost shall also,include the cost of labor and materials furnished <br /> by the Owner and any equipment which has been designed,specified, selected or <br /> specially provided for by the Architect. It shall also include the Contractor's <br /> compensation for services, Reimbursable Costs and the cost of work provided by <br /> the Contractor. <br /> (3) Construction Cost does not include the compensation of the Architect and the <br /> Architect's consultants, the cost of the land, rights-of-way, contingencies for <br /> changes in the Work,or other costs which are the responsibility of the Owner. <br /> 7.2 RESPONSIBILITY FOR CONSTRUCTION COST t, <br /> (1) The Architect,as a design professional familiar with the construction industry,shall <br /> assist the Contractor in evaluating the Owner's Construction Budget, and shall <br /> review the estimates of Construction Cost prepared by the Contractor. It is <br /> recognized,however,that neither the.Architect,nor the Owner has control over the <br /> cost of labor,materials or equipment,over the Contractors' method of determining <br /> Bid prices, or over competitive bidding, market or negotiating conditions. <br /> Accordingly, the Architect cannot and does not warrant or represent that Bids or <br /> negotiated prices will not vary from the construction budget proposed,established <br /> or approved by the Owner,or from the estimate of Construction Cost or other cost <br /> estimate or evaluation prepared by the Contractor. <br /> (2) No fixed limit of Construction Cost shall be established as a condition of this <br /> Agreement by the furnishing,proposal,or establishment of a Project budget,unless <br /> such fixed limit has been agreed upon. If such a fixed limit has been established, <br /> the Contractor will include contingencies for design, bidding and price escalation <br /> and the Contractor will consult with the Architect to determine what materials, <br /> equipment,component systems and types of construction are to be included in the <br /> Contract Documents,to make reasonable adjustments in the scope of the Project, <br /> and to include in the Contract Documents alternate Bids to adjust the Construction <br /> Cost to the fixed limit. <br /> C1415- PERKINS&WILL ARCHITECTS INC. 14 <br /> 111 <br /> 142 Sunny Isles Government Center Lobby+Gateway Park Build-Out <br />
The URL can be used to link to this page
Your browser does not support the video tag.