|
. z
<br /> ARCHITEdTANGitit E 4U` 4U CA fO k ' �
<br /> , . ,
<br /> nCONTRACTeSPECIFIC QUALIFICATIONS ` �,
<br /> Aa-- r � a �d `" � pa
<br /> :j +sw b?on a v e e.�xr M. h x �++ i€aaa8"��*�S+>'^,r ,Yc.z 1"' ~ti4a"°d' 5,✓ 4 �',, t �
<br /> t �; ��E , sp� a .,�,a,RESUMES OF KEY PERSONNEL PROPOSED FOReTHIS CONTRACT(Complete one Sect(on,E for each_,key person) �,y�. r� `� '?
<br /> 12.NAME 13.ROLE!NINE,CONI RACE 14.YEARS OF EXPERIENCE
<br /> Igor F.Gonzalez Mechanical Engineer of Record 101a1 a.With Current Fire,
<br /> 23 13
<br /> 15.FIRM NAr,^:EE.CND LOCATION(City eeC State)
<br /> ESI Consulting Engineers,Inc./Doral,Florida
<br /> ill.EDUCATION(Degree and Specialization) 17.CURRENT PROFESSIONAL.REGISTRATION
<br /> Bachelor's degree in Mechanical Engineering state and Discipline)
<br /> University of New Orleans State of Florida—PE#56098 ti ;
<br /> Mechanical Engineering
<br /> I5.OTHER PROFESSIONAL.DUAL.IF ICA1 LONE(Publications.O,ca iratio»s,Training,awards,etc.)
<br /> Prior to starting his own consulting design firm, Igor Gonzalez served as a Design Engineer and Director of Mechanical Engineering for
<br /> Spillis Candela DMJM for over 9 years. He also served as a Junior Engineer in West Davidson Reynolds Consulting Engineers in Kansas
<br /> City,and over 6 years in the US Army Reserves as a combat engineer and an administrative specialist. Mr.Gonzalez is a LEED Accredited
<br /> Professional and holds affiliations with the US Green Building Council(USBGC);American Society of Heating, Refrigerating and Air
<br /> Conditioning Engineers(ASHRAE); National Fire Protection Association(NFPA);and American Society of Plumbing Engineers(ASPE). He
<br /> is fluent in English and Spanish.
<br /> 15.PLLEVANI PROJECil;
<br /> 1.TITLE.01111 LOCATION(Cit),aed Slate) 2.YEAR COMPLETED a'
<br /> A Sunny Isles Government Center Expansion ia.Prot,ssional Se rvicee; ib.Conetruetion(if applicable)
<br /> Sunny Isles Beach, Florida 2016 Presently on Hold
<br /> ;< ERIE I DESCRIPTION and SPECIFIC ROLE(Eliot-scope sire cost,etc.) E.)Check if pr o,ect perror`led 1^,1`1 curl en!tiro)
<br /> Mechanical Engineer of Record for the design of the±183,000 SF multi-purpose Annex Expansion to the City's Government Center. The
<br /> new 8-story facility consisted of a±52,000 SF underground parking garage,±49,000 SF middle school,±29,000 SF Public Area/Theatre,
<br /> ±21,000 SF Senior Activity Center,and a±32,000 SF Office Tower. The overall construction cost was estimated at$62.6 Million.
<br /> 9.TITLE AND L.00ia"ION(City and Sale) 2.YEAR COMPLETED
<br /> B Broward Health North-ED&OR Expansion and Sterile Processing Department 20.F,ofees1e1101 Se,eic.I 21,.Con<puction(I1 applrcable)
<br /> Renovation/Deerfield Beach,Florida 2014 Early 2017
<br /> ?.BRIEF DESCRIPTION and Sr-ECIFIC ROLL(Brief scope.sire,cost etc.) , Check if project pel'onned with ct.r:eni fir::;
<br /> Mechanical Engineer of Record for the design of the±54,000 SF,2-story Emergency Dept.(ED)and Operating Suite(OR)expansion
<br /> capital project. The new±37,000 SF ED located on the ground floor consists of(5)Nursing Modules comprising(53)Exam Rooms,(3)
<br /> Trauma Rooms,and ancillary support spaces. The±17,000 SF Surgery Suite on the second floor consists of(6)Class C Operating < .
<br /> Rooms surrounding a shared Sterile Core,with auxiliary support spaces.The overall construction cost was approximately$27 Million.
<br /> 1..1 LE AND LOCATION(City and State) 2.YEAR COMP1.E TED
<br /> C Jackson Health Systems West Campus 2...P,ofe,sional Services :III.Construction(if applicable)
<br /> Doral, Florida 2018(In Progress) 2020(Anticipated)
<br /> 3 BRIEF De SCRIPT ION and SPECIFIC ROLE(Prof scope.size.cost,etc.) El Check if project pes0:I7led with cur;eni fire)
<br /> Mechanical Engineer for a new±297,000 SF 100-Bed Hospital located in Doral,Florida. The Facility consists of a 237,000 Diagnostic&
<br /> Treatment Hospital with an Emergency Dept,Radiology,Surgical Suite,Sterile Processing Dept, ICU,etc.,a 60,000 SF Medical Office
<br /> Building,and also includes a separate±222,000 SF Parking Structure which will house the Central Energy Plant to serve the Facility.
<br /> 1.TITLE AND LOCATION(Cit,and State) 1.YEAR COMPLETED
<br /> D Cayman International School Expansion 1a.Protessional SciOlcea; zb.ConCtrnctlon(if applicable)
<br /> Camana Bay,Grand Cayman,Cayman Islands 2014 2015
<br /> 3.BRIEF DESCRIPTION and SPECIFIC ROLE(Brief scope,size.cost,etc.) []Check if project performed with eurelit firm
<br /> Mechanical Engineer for the±15,500 SF phased expansion of the Cayman International School(CIS)located in the Town of Camana Bay f<
<br /> in Grand Cayman. The expansion included 2-story horizontal expansion to(4)Classroom buildings,a vertical expansion to(3)single
<br /> story Classroom Buildings with the addition of a 2nd story to each,as well as the renovation of several administrative areas. Phase 1,
<br /> consisting of approximately±8,000 SF was designed and completed in 2014. Phase 2,consisting of approximately±7,500 SF,was
<br /> designed and completed in 2015.
<br /> 1.TITLE AND LOCATION(City and State) 2.YEAR COMPLETED ?.
<br /> E City of Sunny Isles Beach City Hall&Police Complex 20.Professional Services 2b.Construction(if applicable)
<br /> Sunny Isles Beach, Florida 2003 Early 2005
<br /> 3.BRIEF DESCRIPTION and SPECIFIC ROLE(Brief scope,size,cost,etc.) ❑Check if project performed with current fin ._..w.
<br /> Mechanical Engineer of Record for the design of the±57,000 SF government complex inclusive of City Hall,Commission Chambers,
<br /> Police Facility,and Public Library.
<br /> ��r
<br />
|