Laserfiche WebLink
III <br /> 1111 <br /> ® <br /> ARCHITECT/ EN.GINEER,QUALIFICATION.B • <br /> QoCONTRACT SPECIFIC QUALIFICATIONS <br /> • <br /> E RESUMES OF..KEY PERSONNEL':PROPOSED FOR THIS CONTRACT(Complete-one Section_E for each key=person) - - <br /> III 1' 'APSE _ 13.RLE INiHIS C O'.T FACT 1 1 EARS O E XPERIF..NCE <br /> Jorge Velazquez Project Manager/Mechanical o,al I,nth CU Ent Fire, <br /> Designer 11 11 <br /> II 15.FIRI2 NAME AND LOCATION(Cryand Sa,e) <br /> ESI Consulting Engineers, Inc./Doral,Florida <br /> IF.EDUCATION(Degree and Sp_=eI e;ion) 17.CURRENT PROF ESSIONAL.REGISTRPTIOF! <br /> Il Bachelor's Degree in Mechanical Engineering s:a:eandrneopr,:,_) <br /> University of Florida N/A <br /> 18.OTHER PROF !:.1.DUAL.IFICAI IONS(F,hSceuons.vganiza;rinc.Traimnc A,rarsB,e,c) <br /> Mr.Velazquez has over 11 years of experience in the mechanical engineering design field. Since joining the ESI Team after graduating <br /> IIIfrom the University of Florida,Jorge has become Project Manager and has extensive experience in HVAC design for Commercial, <br /> Healthcare, Educational,and Institutional facilities,among others. His primary responsibilities include HVAC Design, MEP Project <br /> Management and coordination among the different disciplines,as well as with Clients. Jorge is a LEED Accredited Professional and has <br /> extensive experience in the use of Computer Aided Design software,such as AutoCAD and Revit. He is also fluent in English and Spanish. <br /> IF.RELEVANT PROJECTS <br /> i.TITI..E AND LOCATION(City anti Sar) A.YEAR CO:::PLE TED <br /> 111 A Jackson Memorial Hospital—Various Interior Renovations <br /> Miami, <br /> Se,cieee 1 <br /> 2n.ccns;:uetion, s puss 2121 <br /> Miami,Florida 2016 2016-2019 <br /> 3.BRIEF DESCRIPTION and SPECIFIC ROLE(E+,-•_opc.,Ire co,etc) D Chech i1 pieject performed with ci.rent fir111 <br /> 111 HVAC Project Manager and Designer for various renovations of approximately±450,000 SF throughout the Facility totaling approximately <br /> ±S100M in construction costs. The various renovations have included Rape Treatment Center,Poison Control,Central Sterile Services <br /> Renovation,Telemetry, Behavioral Health,Gastro-Intestinal Suite,and Diagnostics Renovation among many others. <br /> I.TITLE ANC)LOCATION(City and Sia,e) 2.YEAR COiSPLET ED <br /> 111 B Jackson Memorial Hospital Emergency Department Expansion 2a.Pro;e slenal Service, Tb.Ccnstrnc:on(„a;;p(,rat,re; <br /> Miami, Florida 2018(In Progress) 2020(Anticipated) <br /> 3.BRIEF DESCRIPI ION and SPECIFIC ROLE_IEric(e-op:..5i_e.cos.etc) 0 Check if plojeCi Jeltouned with Clll l en)firm <br /> I HVAC Project Manager and Designer for the±115,000 SF expansion of the Hospital's Main Emergency Department,plus the renovation <br /> of±47,000 SF of the existing Emergency Department totaling approximately$190 million in construction cost. The project includes$18.5 <br /> million for upgrades to the Hospital's Central Energy Plant(CEP)as well as other enabling projects. <br /> I.T ITLE AND LOCATION(Cdr and Stol.) 1 YEAR C0iiPLETEI) <br /> C University of Miami-McKnight Center,Medical Campus 8th Floor Renovation 2e.Professional Services Tb.Consnnstion(I;a,npTT._a-,r) <br /> Miami, Florida 2013 2016 <br /> I 3.BRIEF.DESCRIPTION and SPECIFIC ROLE s((SO =ire.cos,etc.) D Check if project performed with Clnelt tarn <br /> MEP Project Manager and HVAC Designer for the renovation of the±9,000 SF 8th floor to accommodate 6,000 SF of Bio-Safety Lab <br /> Level 1 space for research,as well as 3,000 SF Vision Science and Investigative Ophthalmology instructional space. The construction <br /> for the 52.5M project was done in(2)phases in order to keep a large portion of the floor in-use during construction,and required detailed <br /> design planning in order to facilitate the transition between phases. _ <br /> I.TITLE AND LOCATION(Ci:yand Sr!,) 2.YEAR COISPLEl ED <br /> D University of Miami—Fox Building,Medical Campus—3rd and 5th Floors 2a.Professional So,sices zn.Const,uction(ifappa�a:,r-) <br /> Renovation/Miami,Florida 2015 2017 <br /> 111 3.ERIEF DESCRIPTION and SPECIFIC ROLE.(E/ie crone.5122.LOSS c:c) J Check if project pedolmed with current firm <br /> MEP Project Manager and HVAC Designer for the±11,000 SF renovation of the 3rd and 518 floors of the building to accommodate Cancer <br /> Center Offices. The project's scope of work included the complete demolition and renovation of both floors. The renovation entailed <br /> 11 completely new MEP distribution throughout both floors,including new Air Handling Units to serve each floor. <br /> 1.TITLE AND LOCATION(City and Sate) 2.YEAR COJ,TFL E1ED <br /> E University of Miami-Clinic Research Building,Medical Campus—Various 2a.Professional Services 2b.Construction(i;appOCame) <br /> IIRenovations/Miami, Florida 2010-2017 2011—2017(In Progress) <br /> I.BRIEF DESCRIPTION and SPECIFIC ROLE(Brief scope.size.cost.Bic.) 0 Check if project performed with current firm <br /> MEP Project Manager and HVAC Designer for the renovation of several suites throughout the Clinical Research Building,including 3rd, <br /> IIStn 618,7th 9th, 12)11 and 15th floors thus far,as well as the new Multi-Disciplinary Pain Management Clinic located at the Wellness Center. <br />