Laserfiche WebLink
111 <br /> sa~w a•� fie+ . 3,,, T ria a rt ,� v* r a zn <br /> cr 7 <br /> ARCHOEcr r g NOME 0: QttdQATio s <br /> ART CONTRACT SPECIFIC QUALIFICATIONS ,� wu ', >fc„c- :. .` �..`s .$k "a gin, <br /> E RESUMES OF.KEYPERSONNEL PROPOSED FOR THIS CONTRACT+'(Complete one Section E for each key person) � fi <br /> ,arm ,_�,..e.tax;.a--. rf a:,x�<_' >fiz„ s;. w.,.•� r'a *s- ,., ,^s d,ate,. ,ssr..v.,.,'.z,m*,._ _,..mss.e.a�1' •.b..,.. . .a,. �:.” ., .. <br /> 12 NAME 13 ROLE IN THIS COI/IRACT 14 YEARS OF EXPERIENCE: <br /> ICF: <br /> Karin N.de Cubas Project Manager/Mechanical ,.To,al With.e;rent <br /> Designer 19 12 <br /> 15.FIRM NAME AND LOCATION(City end State) <br /> ESI Consulting Engineers, Inc./Doral,Florida <br /> EDETCAIION(Degree and Specialization) 17.CURRENT PROFESSIONAL FtEGIST IcAT ION <br /> Mechanical Engineering 'State and Discipline) <br /> Florida International University N/A <br /> ib.OTHER PROS F/SSIONxt.0001.15(CAIONS(Publications,Organi:etions.Training.An•ards,etc.) <br /> Ms.de Cubas has over 19 years of experience in the mechanical engineering design field. Her diverse range of expertise comprises , <br /> design for Commercial,Healthcare, Educational,and Institutional facilities,among others. Her primary responsibilities include Project <br /> Management and coordination among the different disciplines,as well as with Clients. Karin also has extensive experience in the use of <br /> Computer Aided Design software,such as AutoCAD and Revit. In addition,Karin is fully fluent in English,Spanish,and French. <br /> 19.RELEVANT PROJECTS <br /> I.TITLE_AND LOCATION(City and State) 2.YEAR COMPLETED <br /> A 3roward Health North-ED&OR Expansion and Sterile Processing Department Ia.r-rates:-icnr.l Senares 21,Con•_trurlinn(ua(;ntr.nble) <br /> Renovation/Deerfield Beach,Florida 2014 Early 2017111 <br /> 's.BRIEF DESCRIPTION and SPECIFIC ROLE(Brief scope,Siza,cost,etc.) E].1 Check if project per'orllled with Ctrl en;firm <br /> HVAC Project Manager and Designer for the±54,000 SF,2-story Emergency Dept.(ED)and Operating Suite(OR)expansion capital <br /> project. The new±37,000 SF ED located on the ground floor consists of(5)Nursing Modules comprising(53)Exam Rooms,(3)Trauma <br /> Rooms,and ancillary support spaces. The±17,000 SF Surgery Suite on the second floor consists of(6)Class C Operating Rooms <br /> surrounding a shared Sterile Core,with auxiliary support spaces.The overall construction cost was approximately$27 Million. <br /> 1.TITLE AND 1.DCA'IION(City and State) 2.YEAR COMPLETED <br /> B Jackson Health Systems West Campus ;:,.Professional Services 2b.Co,erIructicn(if applicable) <br /> Doral,Florida 2018(In Progress) 2020(Anticipated) <br /> 3.BRIEF DESCRIPTION and SPECIFIC ROLE(Ede;scope.size,cost.etc.) El Check if p,oeci performed with on rent firm <br /> HVAC Project Manager and Designer for a new±297,000 SF 100-Bed Hospital located in Doral, Florida. The Facility consists of a <br /> 237,000 Diagnostic&Treatment Hospital with an Emergency Dept,Radiology,Surgical Suite,Sterile Processing Dept, ICU,etc.,a <br /> 60,000 SF Medical Office Building,and also includes a separate±222,000 SF Parking Structure which will house the Central Energy <br /> Plant to serve the Facility. The overall construction cost is estimated at$252 Million. <br /> I.1111.E AND LOCATION(City and State) 2.YEAR comp'..ETEE/ <br /> C Cayman International School Expansion za.Professional Service,. 25.Cnnsln,ctio„(rfapplicable) <br /> Camana Bay,Grand Cayman,Cayman Islands 2014 2015 <br /> 3.PRIEF DESCRIPTION and SPECIFIC ROLE/.(Brei scope,size.cost.etc.) [l Check if project peltorli?ed 11/111 Current firm <br /> MEP Project Manager for the±15,500 SF phased expansion of the Cayman International School(CIS)located in the Town of Camana <br /> Bay in Grand Cayman. The expansion included 2-story horizontal expansion to(4)Classroom buildings,a vertical expansion to(3)single <br /> story Classroom Buildings with the addition of a 2nd story to each,as well as the renovation of several administrative areas. Phase 1, <br /> consisting of approximately±8,000 SF was designed and completed in 2014. Phase 2,consisting of approximately±7,500 SF,was <br /> designed and completed in 2015. <br /> TITLE AND LOCATION(City and State) 2.YEAR COMPLE/TED <br /> D Broward Health Imperial Point-Ambulatory Surgical Center 2a.Professional Services 21,Construction(if applicable) i <br /> Fort Lauderdale,Florida 2009 2010 ff, <br /> 3.BRIEF DESCRIPTION and SPECIFIC 5201..E(Brief scope,size.cost.etc.) L2j Check if project performed with current fir <br /> MEP Project Manager for the±12,000 SF Ambulatory Surgical Center located on the ground floor of the 4-story Medical Arts Pavilion, <br /> and consisting of four(4)Class C Operating Rooms,an 18-bed Phase 1 &Phase 2 PACU Recovery area,ancillary support services <br /> areas. The MEP design included the addition of(2)dedicated Air Cooled Chillers,(2)Air Handling Units,and a 400kW Diesel Generator <br /> to serve the ASC independently from the rest of the Building. <br /> 1.TITLE.AND LOCA:(ION(City and State) 2.YEAR COMPL.ETE/D <br /> E Broward Health Imperial Point—Cardiac Catheterization Suite 2a.Professional Services 25.Construction(if applicable) <br /> Fort Lauderdale, Florida 2016 Pending <br /> 3.E3RIEF DESCRIPTION and SPECIFIC ROLE(Brief scope,size.cost.etc.) [PJ Check if project performed with current firm <br /> MEP Project Manager for the design of a±9,000 SF Cardiac Catheterization Suite located on the ground floor of the Hospital,and <br /> consisting of two(2)Cath Labs,with a shared Control Room,a 4-bed Pre/Post-Op area,(7)Exam Rooms,Pace Maker,Ultrasound, <br /> Nuclear Camera&Hot Lab,Stress Testing,as well as Waiting Room,Administration Offices,Staff Lounge,Toilet Rooms,and Support <br /> Spaces(Clean Supply,Soiled Holding,etc.). <br /> ,E� <br />