Laserfiche WebLink
11 <br /> 11 <br /> ARCHITECT 1 ENGINEER Q.0 4LIFICATIONS . <br /> -ART I ,CONTRACT QUALIFICATIONS <br /> E RESUMES OF KEY PERSONNEL:PROPOSED FOR THIS"CONTRACT•(Coinplete one Section E for each key person) :, <br /> 111 12.NAME - 12.POLE IN THIS CONTRACT 1 YEARS OF EXPERIENCE <br /> Hector Ceballos BIM Champion .Tota, i <br /> ,V,AthCurronti,rn, <br /> 4 4 <br /> 11 15.FIRM NAME.AND LOCATION(Ci:,,and Sre:e) <br /> ESI Consulting Engineers,Inc./Doral,Florida <br /> 18.EDUCATION(Degree and Cpecielrza:iee) 17.CURRENT PROFESSIONAL REGISTRATION <br /> 111 Master's degree in Architecture state and Dscipcnel <br /> Florida International University N/A <br /> 13.OTHER PROFESSIONAL OUALIFICOTIONS(FtlbhCETiOfiS Orgaaiza:roes Treining -...ar,._ ,a:) <br /> IIII Hector joined ESI Consulting Engineers in 2013 while he was studying for his Master's degree in Architecture. Prior to joining ESI, Hector <br /> also worked for a local Architectural firm for 2 years. After obtaining his Master's,he came onboard with ESI in full-time capacity and <br /> immediately started taking on large projects using his extensive expertise in Revit among other software. His experience includes working <br /> on Healthcare,Commercial,and Educational facilities. He is fluent in English and Spanish. <br /> ill i?.RELEVANT PROJECTS <br /> 1.TITLE AND LOCATION(Ci(y r,d Sa:e) 2.YEAR COMPLETER <br /> A Sunny Isles Government Center Expansion b.i:._.oel,or.tion r ai-Ocal.,e) <br /> II3Sunny Isles Beach, Florida 2016 Presently on Hold <br /> .BRIEF DESCRIPTION and SPECIFIC ROLE(E,a,crepe._rte m_:arc) El Check:if p:ojECi pe,':O!med vAl1i(31:Tent i5, <br /> HVAC Project Manager and BIM Champion for the design of the±183,000 SF multi-purpose Annex Expansion to the City's Government <br /> IN Center. The new 8-story facility consisted of a±52,000 SF underground parking garage,±49,000 SF middle school,±29,000 SF Public <br /> Area/Theatre,±21,000 SF Senior Activity Center,and a±32,000 SF Office Tower. The overall construction cost was estimated at S62.6 <br /> Million. <br /> 1.1111_E AND LOCATION(Cay and S:a:r) 2.Y55.0 COMPLETED <br /> IN B 3roward Health North-ED&OR Expansion and Sterile Processing Department 2e.P, I ss;nnai 15:',i1:115 Cor <br /> Renovation/Deerfield Beach,Florida 2014 Early 2017 <br /> 3.BRIEF DESCRIPTION and SPECIFIC ROLE.(Eref ecOce ore.cos:.,;r) Li Check,if i'1Ojeci per1O,i,cd vlifI,al:rent i,i,il <br /> ill BIM Champion of the±54,000 SF,2-story Emergency Dept.(ED)and Operating Suite(OR)expansion capital project. The new±37,000 <br /> SF ED located on the ground floor consists of(5)Nursing Modules comprising(53)Exam Rooms,(3)Trauma Rooms,and ancillary <br /> support spaces. The±17,000 SF Surgery Suite on the second floor consists of(6)Class C Operating Rooms surrounding a shared <br /> Sterile Core,with auxiliary support spaces.The overall construction cost was approximately S27 Million. <br /> Illi I.TITLE.AND LOCATION(City and Sere) <br /> 2.YEAR COMPLETED <br /> C Jackson Health Systems Rehabilitation Hospital 2a.Prclees;onal Err>;«< 2b.COn_IrncliOn(,faeFmce(ae) <br /> Miami, Florida 2016(In Progress) Late 2019(Anticipated) <br /> lig J.BRIEF DESCRIPTION and SPECIFIC ROLE(Brief scope.she cos:.e:c.) (]CI:eck if pIOJECi perfOimed WW1 CLIrl elll ficin <br /> HVAC Project Manager and BIM Champion for a comprehensive rehabilitation hospital of±250,000 SF, housing 96 rehabilitation beds, <br /> clinics,designated research space,diagnostic and treatment areas,aquatic therapies and faculty offices.The hospital will deliver <br /> inpatient care,outpatient services,and a wide array of support services for patients with spinal cord injuries,brain injuries and a broad <br /> spectrum of medical and physical conditions. The construction cost is currently estimated at approximately S180 million. <br /> 1.TITLE AND LOCATION(Cryand Srere) 2.YEAR COMPLETED <br /> D Baptist Health South Florida—Atrium Building HVAC&Controls Upgrade 2a.Professional Services 2b.Construction(,;applicable) <br /> South Miami,Florida 2015 2017 <br /> 3.EPIEP DESCRIPTION cod SPECIFIC ROLE(frier score,sze.cost etc.) U Check if pIO eCL erformed\'cfIT CUT:ert film <br /> MEP Project Manager and BIM Champion for the replacement of four(4)Air Handling Units and associated controls serving the second <br /> 111 and third floors of the Medical Office Building. The project required detailed coordination due to the very limited space inside the existing <br /> Mechanical Rooms. <br /> 1.1111.E AND LOCATION(Ci:y and Sia:e) 2.YEAR COMPLETED <br /> E Broward Health Imperial Point—Cardiac Catheterization Suiteii Te.Process ona(se: leas 2b.Cone It eclin,,(a applicable) <br /> Fort Lauderdale,Florida 2016 Pending <br /> 3.BRIEF DESCRIPTION and SPECIFIC POLE(Brief scope.size.roes etc.) U Check if Project performed v0ith Cin10131 Grin <br /> II BIM Champion for the design of a±9,000 SF Cardiac Catheterization Suite located on the ground floor of the Hospital,and consisting of <br /> two(2)Cath Labs,with a shared Control Room,a 4-bed Pre/Post-Op area,(7)Exam Rooms, Pace Maker, Ultrasound,Nuclear Camera <br /> &Hot Lab,Stress Testing,as well as Waiting Room,Administration Offices,Staff Lounge,Toilet Rooms,and Support Spaces(Clean <br /> Supply,Soiled Holding,etc.). <br />