|
11
<br /> 11
<br /> ARCHITECT 1 ENGINEER Q.0 4LIFICATIONS .
<br /> -ART I ,CONTRACT QUALIFICATIONS
<br /> E RESUMES OF KEY PERSONNEL:PROPOSED FOR THIS"CONTRACT•(Coinplete one Section E for each key person) :,
<br /> 111 12.NAME - 12.POLE IN THIS CONTRACT 1 YEARS OF EXPERIENCE
<br /> Hector Ceballos BIM Champion .Tota, i
<br /> ,V,AthCurronti,rn,
<br /> 4 4
<br /> 11 15.FIRM NAME.AND LOCATION(Ci:,,and Sre:e)
<br /> ESI Consulting Engineers,Inc./Doral,Florida
<br /> 18.EDUCATION(Degree and Cpecielrza:iee) 17.CURRENT PROFESSIONAL REGISTRATION
<br /> 111 Master's degree in Architecture state and Dscipcnel
<br /> Florida International University N/A
<br /> 13.OTHER PROFESSIONAL OUALIFICOTIONS(FtlbhCETiOfiS Orgaaiza:roes Treining -...ar,._ ,a:)
<br /> IIII Hector joined ESI Consulting Engineers in 2013 while he was studying for his Master's degree in Architecture. Prior to joining ESI, Hector
<br /> also worked for a local Architectural firm for 2 years. After obtaining his Master's,he came onboard with ESI in full-time capacity and
<br /> immediately started taking on large projects using his extensive expertise in Revit among other software. His experience includes working
<br /> on Healthcare,Commercial,and Educational facilities. He is fluent in English and Spanish.
<br /> ill i?.RELEVANT PROJECTS
<br /> 1.TITLE AND LOCATION(Ci(y r,d Sa:e) 2.YEAR COMPLETER
<br /> A Sunny Isles Government Center Expansion b.i:._.oel,or.tion r ai-Ocal.,e)
<br /> II3Sunny Isles Beach, Florida 2016 Presently on Hold
<br /> .BRIEF DESCRIPTION and SPECIFIC ROLE(E,a,crepe._rte m_:arc) El Check:if p:ojECi pe,':O!med vAl1i(31:Tent i5,
<br /> HVAC Project Manager and BIM Champion for the design of the±183,000 SF multi-purpose Annex Expansion to the City's Government
<br /> IN Center. The new 8-story facility consisted of a±52,000 SF underground parking garage,±49,000 SF middle school,±29,000 SF Public
<br /> Area/Theatre,±21,000 SF Senior Activity Center,and a±32,000 SF Office Tower. The overall construction cost was estimated at S62.6
<br /> Million.
<br /> 1.1111_E AND LOCATION(Cay and S:a:r) 2.Y55.0 COMPLETED
<br /> IN B 3roward Health North-ED&OR Expansion and Sterile Processing Department 2e.P, I ss;nnai 15:',i1:115 Cor
<br /> Renovation/Deerfield Beach,Florida 2014 Early 2017
<br /> 3.BRIEF DESCRIPTION and SPECIFIC ROLE.(Eref ecOce ore.cos:.,;r) Li Check,if i'1Ojeci per1O,i,cd vlifI,al:rent i,i,il
<br /> ill BIM Champion of the±54,000 SF,2-story Emergency Dept.(ED)and Operating Suite(OR)expansion capital project. The new±37,000
<br /> SF ED located on the ground floor consists of(5)Nursing Modules comprising(53)Exam Rooms,(3)Trauma Rooms,and ancillary
<br /> support spaces. The±17,000 SF Surgery Suite on the second floor consists of(6)Class C Operating Rooms surrounding a shared
<br /> Sterile Core,with auxiliary support spaces.The overall construction cost was approximately S27 Million.
<br /> Illi I.TITLE.AND LOCATION(City and Sere)
<br /> 2.YEAR COMPLETED
<br /> C Jackson Health Systems Rehabilitation Hospital 2a.Prclees;onal Err>;«< 2b.COn_IrncliOn(,faeFmce(ae)
<br /> Miami, Florida 2016(In Progress) Late 2019(Anticipated)
<br /> lig J.BRIEF DESCRIPTION and SPECIFIC ROLE(Brief scope.she cos:.e:c.) (]CI:eck if pIOJECi perfOimed WW1 CLIrl elll ficin
<br /> HVAC Project Manager and BIM Champion for a comprehensive rehabilitation hospital of±250,000 SF, housing 96 rehabilitation beds,
<br /> clinics,designated research space,diagnostic and treatment areas,aquatic therapies and faculty offices.The hospital will deliver
<br /> inpatient care,outpatient services,and a wide array of support services for patients with spinal cord injuries,brain injuries and a broad
<br /> spectrum of medical and physical conditions. The construction cost is currently estimated at approximately S180 million.
<br /> 1.TITLE AND LOCATION(Cryand Srere) 2.YEAR COMPLETED
<br /> D Baptist Health South Florida—Atrium Building HVAC&Controls Upgrade 2a.Professional Services 2b.Construction(,;applicable)
<br /> South Miami,Florida 2015 2017
<br /> 3.EPIEP DESCRIPTION cod SPECIFIC ROLE(frier score,sze.cost etc.) U Check if pIO eCL erformed\'cfIT CUT:ert film
<br /> MEP Project Manager and BIM Champion for the replacement of four(4)Air Handling Units and associated controls serving the second
<br /> 111 and third floors of the Medical Office Building. The project required detailed coordination due to the very limited space inside the existing
<br /> Mechanical Rooms.
<br /> 1.1111.E AND LOCATION(Ci:y and Sia:e) 2.YEAR COMPLETED
<br /> E Broward Health Imperial Point—Cardiac Catheterization Suiteii Te.Process ona(se: leas 2b.Cone It eclin,,(a applicable)
<br /> Fort Lauderdale,Florida 2016 Pending
<br /> 3.BRIEF DESCRIPTION and SPECIFIC POLE(Brief scope.size.roes etc.) U Check if Project performed v0ith Cin10131 Grin
<br /> II BIM Champion for the design of a±9,000 SF Cardiac Catheterization Suite located on the ground floor of the Hospital,and consisting of
<br /> two(2)Cath Labs,with a shared Control Room,a 4-bed Pre/Post-Op area,(7)Exam Rooms, Pace Maker, Ultrasound,Nuclear Camera
<br /> &Hot Lab,Stress Testing,as well as Waiting Room,Administration Offices,Staff Lounge,Toilet Rooms,and Support Spaces(Clean
<br /> Supply,Soiled Holding,etc.).
<br />
|