My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Wolfberg Alvarez & Partners
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(17-12-01) Professional Arch Srvcs Interior Remodel Govt Ctr Lobby and Gateway Park Internal Space Build
>
Responses
>
Wolfberg Alvarez & Partners
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/10/2018 10:08:51 AM
Creation date
1/10/2018 10:08:42 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Professional Architecture Services
Bid No. (xx-xx-xx)
17-12-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The software is important to our success in . <br /> managing projects and keeping them on sched PROJECT <br /> ule. However, it was recently brought to WA's <br /> attention that the preferred method to use is <br /> e-Builder. Once given instructions and access DELIVERABLES <br /> to the system the firm will strictly comply with <br /> all SBBC's technology requirements. <br /> TASK 1: DESIGN&SCHEMATIC DESIGN <br /> QUALITY CONTROL • Understandingof the Project-Team analyzes <br /> WA employs a comprehensive firm-wide Qual program and completes a site visit <br /> • <br /> ity Assurance Program. The following Quality Site development conceptual planning <br /> Assurance Procedures will be instituted for this • <br /> Utility development planning <br /> RFQ: • Circulation <br /> • A kick-off and goals setting meeting is held • <br /> Planning,zoningandcodeanalysis <br /> • <br /> to review the project scope and determine Prepare budget <br /> the requirements for each discipline. A • Deliver schematic design drawings and docu- <br /> project management and quality assurance ments for preliminary approval <br /> plan is prepared and agreed upon at the <br /> onset of the project. . TASK 2: DESIGN DEVELOPMENT <br /> • At each phase of document submittal, all • Design development plans,components will <br /> review comments are addressed and evalu- . include:program scope,uses relationships, <br /> ated in a full design team meeting. sizes,finishes,materials and colors,plant- <br /> • Project coordination checklists are used for ings,exterior and interior finishesetc. <br /> each design phase. Responsibilities of each • Code analysis compliance <br /> team member are clearly documented and • Develop the MEP and irrigation drawings <br /> a cross check is performed for compliance • Pedestrian circulation <br /> with the construction budget. Any escala- • LEED certification if applicable,proposed <br /> tion in the estimate is brought to the atten- sustainable design elements and products <br /> tion of City of Sunny Isles Beach to deter- • Submit design development drawings and <br /> mine alternatives and further direction. documents to the city for review <br /> • <br /> WA assigns a quality control manager to review TASK 3:CONSTRUCTION DOCUMENTS <br /> the documents for constructibility and general <br /> • <br /> coordination disciplines. The project manager Construction documents and specifications <br /> and project coordinator review the documents preparation based on approved Design Devel <br /> for incorporation of all items in the scope ser- opment Documents and updated budget. <br /> • <br /> vices. The project is also reviewed by the de- Incorporate city requirements for completing <br /> partment heads in each discipline for accuracy ConstructioniDocuments <br /> and completeness. • Deliver 100%Construction Documents and <br /> 100%Project manual <br /> During the preconstruction period an indepen- <br /> dent, senior staff member(s)who is not actively TASK 4: BIDDING AND PERMITTING <br /> involved with the project, is tasked with review- • Competitive bidding and bidding assistance <br /> ing the progress in step with a formal submit- and value engineering <br /> tal. A progress set is"red-lined" and distributed • Provide the city assistance during the permit- <br /> to the project manager and assigned staff for ting process <br /> correction. A follow-up meeting is scheduled to <br /> review the incorporated comments before the <br /> documents are issued. <br />
The URL can be used to link to this page
Your browser does not support the video tag.