My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Wolfberg Alvarez & Partners
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(17-12-01) Professional Arch Srvcs Interior Remodel Govt Ctr Lobby and Gateway Park Internal Space Build
>
Responses
>
Wolfberg Alvarez & Partners
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/10/2018 10:08:51 AM
Creation date
1/10/2018 10:08:42 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Professional Architecture Services
Bid No. (xx-xx-xx)
17-12-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SUNNY ISLES BEACH 7 <br /> RFQ 17-12-01 PROFESSIONAL ARCHITECTURAL SERVICES <br /> • Design of new millwork ule progress and requirements on that <br /> • New reception desks for two (2)guards. project. In-house weekly status meetings <br /> • Consider location existing AV screen and will allow for quick response as needed <br /> spec of existing UV machine. and the firm's staffing depth will ensure the <br /> • Relocate power, data and telecom and availability of the resources to respond to <br /> security as required. multiple schedule demands. <br /> • Mechanical system <br /> • Existing ceiling soffits and lighting to re- <br /> main. The commitment of the firm to provide <br /> • No changes to Fire Protection systems professional excellence and responsive- <br /> • Propose new locations and new planter ness for this project will remain uncom- <br /> design to be materially aligned to new promised while meeting established <br /> model base and reception desk schedules. The projected work load for <br /> our collective firms and staffing levels, <br /> Gateway Park- 17,420.00 square feet combined with the availability of an expe- <br /> • Result in a community center rienced team of professionals in all dis- <br /> • Office Space ciplines will enable our team not only to <br /> • Reception Area maintain continuing schedule control, but <br /> • Multi Purpose Rooms <br /> • Catering Kitchen best satisfy the total needs of this project. <br /> As an example of the firm's ability to meet <br /> OFFICE LOCATION or beat project schedules, below are four <br /> All work performed on this project will be corn- project examples where WA has beat the <br /> pleted out of our Coral Gables office at 75 original design schedule. <br /> Valenica Ave., the estimated times to each lo- <br /> cation is: Quality Control <br /> Government Center 38 minutes WA employs a comprehensive firm-wide <br /> Gateway Park 39 minute <br /> Quality Assurance Program. The following <br /> Quality Assurance Procedures are institut- <br /> ed for each project: <br /> Schedule Control Methods • A kick-off and goals setting meeting is <br /> WA takes pride in an outstanding record held to review the project scope and <br /> for responsiveness to established sched- determine the requirements for each <br /> ules. Particularly important to this contract discipline. A project management and <br /> is our exceptional record for meeting con- quality assurance plan is prepared and <br /> strained schedules for contracts involving agreed upon at the onset of the project <br /> public facilities. In the execution of simi- design phase. <br /> lar work, the firm has always met sched- . At each phase of document submittal, <br /> ule demands. Schedule management for all review comments are addressed and <br /> this contract will be accomplished through evaluated in a full design team meeting, <br /> proven project management procedures including the CM. <br /> combined with a productive project team . Project coordination checklists are <br /> and an ongoing schedule evaluation pro- used for each design phase. Quality As- <br /> cess. A formal schedule will be developed surance responsibilities of each team <br /> to respond to the specific needs of each member are clearly documented and <br /> task and the project manager will regularly a staff member not otherwise involved <br /> meet with City personnel to review sched- with the project is assigned as an inde- <br /> ARCHITECTURE <br /> ENGINEERING TAV <br /> PLANNING <br /> INTERIOR DESIGN <br />
The URL can be used to link to this page
Your browser does not support the video tag.