Laserfiche WebLink
<br />City of Sunny Isles Beach |Request for Proposals No. 18-03-01 18 <br /> <br /> <br />Section 3 <br />Scope of Services / Technical Specifications <br /> <br />3.1 SCOPE OF SERVICES <br /> <br />The City of Sunny Isles Beach (the “City”) intends to secure the services of an onsite <br />attendant hereinafter referred to as (the “Contractor”) who will control traffic at the Pier <br />Park parking lot, located at 16501 Collins Avenue, Sunny Isles Beach, FL 33160. It is the <br />intent of this proposal document that all work for this service shall result in compliance <br />with the terms, conditions, and specifications and all regulatory requirements applicable <br />to such service contained herein. <br /> <br />3.2 INTENT <br /> The intent of this request is to have an attendant in the Pier Park parking lot to provide <br />services as specified in the Scope of Work below. <br />NOTE: The City will evaluate submittals based on ability to perform scope of <br />work as well as cost; Bidders may submit base proposals plus add alternates <br />to provide higher quality of service. <br /> <br />3.3 SCOPE WORK <br /> <br />Hours of Operation: 10 hours per day, typically 9:00 am to 7:00 pm, inclusive of <br />breaks, an attendant must remain present at lot during the hours stated above. The <br />City will have the right to adjust slightly as needed with advance notice to the <br />contractor. <br />Days: 7 days per week, including federal holidays. <br />Location: Pier Park Lot, 16501 Collins Avenue, Sunny Isles Beach, FL 33160. This lot <br />contains a total of 27 regular parking spots, 2 ADA spaces and 2 parking meters. <br /> Contractor shall provide: <br /> 1 or more uniformed bilingual attendants with clearly visible name badges to cover <br />aforementioned hours/days at said location (English and Spanish preferred). <br />o Prior to commencement of operational services, the Contractor shall submit a <br />description of the uniforms proposed to be worn by on-site personnel for <br />Project Manager approval. <br /> Operating supplies for attendants to include a “Lot Full” sign <br /> Hourly rate shall be all inclusive