My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2018-2800
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2018
>
Reso 2018-2800
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/5/2018 4:42:51 PM
Creation date
3/20/2018 4:10:06 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2018-2800
Date (mm/dd/yyyy)
03/15/2018
Description
Approve Agmt w/Perkins+Will for Interior Remodel of Gov’t Ctr Lobby & GW Park Build-Out
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PERKINS +WILL <br /> • <br /> SCHEDULE <br /> Site Verification and BIM Modelling 1 Week <br /> Programming, Planning 2 Weeks <br /> Workshop with the Commission 1 Week <br /> Feasibility Study 3 Weeks <br /> Concept/Schematic Design 3 Weeks <br /> Design Presentation to Commission 1 Week <br /> Design Development 4 Weeks <br /> Review and Approval of Design and Cost 4 Weeks TBD <br /> Construction Documents 6 Weeks <br /> Total Design, estimated Commission Review and Client Review <br /> /Approval Schedule 25 weeks <br /> Review and Approval of Design and Cost (final before permit) 4 Weeks TBD <br /> Bidding/ Permitting (Estimate) 8-12 Weeks TBD <br /> Construction (Estimate) 24 Weeks (Estimate) <br /> Bidding and Permitting could overlap <br /> (Includes off-site fabrication and long lead time items) <br /> Please review the above Schedule. If our understanding is accurate, we will provide a revised Preliminary Project <br /> Schedule. Note: it is understood that the schedule for owner's review and permitting through respective municipal <br /> entities, and construction schedule of the:Interior work is beyond our control. <br /> TEAM ORGANIZATION <br /> The team for the City of Sunny Isles Beach Government Center Improvements will include Lawrence Kline who will <br /> serve as the Managing Principal, Elina Cardet as Design Principal in Charge, Carlos Chui as Architect of Record, Gia <br /> Zapattini as Project Designer, Carlos Vilato as Senior Project Architect, the expanded design team and associated <br /> local consultants delivering a complete Interiors and Engineering design set of documents to the Client. <br /> MEETING SCHEDULE <br /> Based on the proposed design schedule described above, we have assumed a certain number of meetings and <br /> presentations calculated into our fee, not including coordination meetings with engineering consultants. Meetings <br /> can be in person or via Skype. Weekly progress meetings will be held via Skype. <br /> Programming and Site Verification 1 Meeting w/the client <br /> Feasibility Study 2 Meetings w/the client <br /> Concept/Schematic Design 1 Meeting w/the client <br /> Design Presentation to Commission 1 Meeting w/the client <br /> Design Development 1 Meeting w/the client <br /> Review and Approval of Design and Cost 1 Meeting w/the client <br /> Construction Documents 2 Meetings w/the client <br /> Review and Approval of Design and Cost (final before permit) 1 Meeting w/the client <br /> Bidding Permitting 2 Meetings w/the client <br /> Construction Administration 14 OAC meetings / 1 Punch list <br /> Page 17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.