My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2018-2800
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2018
>
Reso 2018-2800
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/5/2018 4:42:51 PM
Creation date
3/20/2018 4:10:06 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2018-2800
Date (mm/dd/yyyy)
03/15/2018
Description
Approve Agmt w/Perkins+Will for Interior Remodel of Gov’t Ctr Lobby & GW Park Build-Out
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PERKINS+WILL <br /> • We assume the Client will provide IT standards and equipment requirements for workstations and Audio <br /> Visual specifications for Security Workstations <br /> • We assume the Client will provide security and surveillance standards (including CCTV ) and requirements <br /> and P+W and its consultants will coordinate with the vendor currently under warrantee and maintenance <br /> agreement. <br /> • Client Review period to be within 1 week for any single submission. Subsequent Client presentations above <br /> and beyond listed below per phase are an additional service. <br /> • • The Architect will be responsible for hiring and managing the Mechanical, Electrical, Plumbing, Fire <br /> Protection Engineers and Telecommunications <br /> • Architect will work closely with the client's consultants, Construction Manager and Furniture Dealership. <br /> • The maximum number of meetings are detailed in this scope and fee proposal per Phase. <br /> • This scope and fee proposal is for Interior Architecture and Interior Design efforts only and does not <br /> include any scope or efforts outside of the space. Our fees within this proposal for design time and <br /> meetings are within the schedule provided by the client and limited to those timeframes; if these <br /> timeframes are extended because of client review and approvals, then the schedule will extend accordingly <br /> and additional services may be incurred. <br /> • Our proposal reflects a 5 business day Client review period at the end of each design phase or as required <br /> by the project schedule, and meetings in order to facilitate design decisions to allow for the project <br /> schedule. • <br /> • Our proposal does not take into account any remobilization effort for project stops of more than 30 <br /> calendar days. <br /> INFORMATION FROM OWNER <br /> • The Client will provide information from the client's direct consultants, including but not limited to, IT and <br /> AV consultant and security consultant, in a timely manner to enable the design team to properly plan for <br /> those elements within the project. <br /> • Client will provide a City of Sunny Isles Beach logo vector files, including logo lock up and branded colors <br /> (PMS, RBG and CMYK) <br /> • If not currently available to P+W, Client will provide most current Revit files or AutoCad dwg files will be <br /> acceptable. For Architectural and Engineering Drawings. If CAD files not available, PDFs or scanned copies <br /> of hardcopy drawings will be required, <br /> Page 16 <br /> SSB <br />
The URL can be used to link to this page
Your browser does not support the video tag.