My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2018-2800
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2018
>
Reso 2018-2800
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/5/2018 4:42:51 PM
Creation date
3/20/2018 4:10:06 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2018-2800
Date (mm/dd/yyyy)
03/15/2018
Description
Approve Agmt w/Perkins+Will for Interior Remodel of Gov’t Ctr Lobby & GW Park Build-Out
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PERKINS+WILL <br /> G. On-site project representation <br /> H. Payment certification /Application for Payment <br /> I. Supplemental documentation <br /> J. Review of change orders from Contractor <br /> K. Project close-out <br /> OTHER SERVICES <br /> For each phase, we will furnish and provide the City with five (5) full-size copies of all plans, (two Permit Sets <br /> must be signed and sealed by architect's sub-consultant) specifications, drawings, and other documents and <br /> electronic versions of same in format. <br /> Hurricane Response: We will assign a representative from our team to communicate via telephone, or report in <br /> person (if telephone service is down) as soon as possible after any severe weather activity, including tropical <br /> storms, or hurricanes. <br /> ESTIMATE PROJECT CONSTRUCTION COST <br /> The City's Construction Budget is the amount budgeted for the construction award of the Project, including <br /> connections to utilities but is exclusive of cost of land, change order contingencies, movable furnishings and <br /> equipment, and professional fees. For this Project, since the program is not.fully developed, we will provide an <br /> estimate after the Feasibility Phase for the City to review and approve. <br /> By fifty (50%) percent completion of the Construction Documents Phase, we will facilitate the resolution with the <br /> City and the Construction Manager any apparent discrepancy between its Estimates of Probable Project <br /> Construction Cost and the scope and requirements of the City. The architect will be permitted to include <br /> acceptable alternates in the Contract Documents for the purpose of providing a finished and acceptable facility <br /> within the City's Construction Budget. The architect will provide two alternates with owner's consent. <br /> We will coordinate with a professional estimating consultant for construction cost estimating at three (3) project <br /> milestones: Feasibility Study, Design Development and Construction Documents. <br /> F F and E <br /> Our team will select interior and exterior furniture if required, and prepare information for and coordinate with the <br /> selected furniture dealer for the amount listed above. Please refer to the F F and E section. <br /> Additional Services and Consultants: <br /> This scope and fee proposal does not include consultants beyond those described in the attached documents <br /> related to basic services for programming and interior architecture and design and structural / MEP efforts. Perkins <br /> +Will can provide consultant services as an additional service if requested by the client; these services may <br /> include but are not limited to the items listed on the Standard Exclusions/Additional Services Form attached. <br /> Services required and requested by the Client which are outside the scope of this proposal will be billed hourly or <br /> as mutually agreed. See Billable Rates attached for Perkins+Will Architects, Inc. See Engineer and Consultants <br /> rates attached. Fees for additional services can be defined with the client prior to the start of the project. <br /> CLARIFICATIONS/ASSUMPTIONS <br /> • Our proposal is valid for 30 days. <br /> Page 15 <br /> SIB <br />
The URL can be used to link to this page
Your browser does not support the video tag.