Laserfiche WebLink
19. Engineer--The individual or entity named 31. Petroleum--Petroleum, including crude <br /> as such in the Agreement oil or any fraction thereof which is liquid at standard <br /> conditions of temperature and pressure(80 degrees <br /> 20. Field Order--A written order issued by Fahrenheit and 14.7 pounds per square inch <br /> Engineer which requires minor changes in the Work absolute), such as oil, petroleum, fuel oil,oil sludge. <br /> but which does not involve a change in the Contract oil refuse, gasoline, kerosene, and oil mixed with <br /> Price or the Contract Times. other non-Hazardous Waste and crude oils. <br /> 21. General Requirements--Sections of 32. Progress Schedule--A schedule, <br /> Division 1 of the Specifications. The General prepared and maintained by Contractor. describing <br /> Requirements.pertain to all sections of the Specifica- the sequence and duration of the activities <br /> tions comprising the Contractors plan to accomplish the <br /> Work within the Contract Times_ <br /> 22. Hazardous Environmental Condition-- <br /> The presence at the Site of Asbestos, PCBs, Petro- 33 Project--The total construction of which <br /> Ieum, Hazardous Waste, or Radioactive Material in the Work to be performed under the Contract <br /> such quantities or circumstances that may present a Documents may be the whole,or a part <br /> substantial danger to persons or property exposed <br /> thereto in connection with the Work. 34. Project Manual—The bound <br /> documentary information prepared for bidding and <br /> 23. Hazardous Waste--The term Hazardous constructing the Work.A listing of the contents of the <br /> Waste shall have the meaning provided in Section Project Manual,which may be bound in one or more <br /> 1004 of the Solid Waste Disposal Act (42 USC volumes, is contained in the table(s)of contents <br /> Section 6903)as amended from time to time. <br /> 35. Radioactive Material--Source, special <br /> 24. Laws and Regulations;Laws or Regulat- nuclear, or byproduct material as defined by the <br /> ions--Any and all applicable laws, rules, regulations, Atomic Energy Act of 1954 (42 USC Section 2011 et <br /> ordinances,codes,and orders of any and all govern- seq.)as amended from time to time <br /> mental bodies, agencies authorities, and courts <br /> having jurisdiction. 38. Related Entity An officer, director, <br /> partner, employee, agent. consultant, or <br /> 25. Liens—Charges, security interests, or subcontractor. <br /> encumbrances upon Project funds, real property, or <br /> personal property. 37. Resident Project Representative--The <br /> authorized representative of Engineer who may be <br /> 26. Milestone-A principal event specified in assigned to the Site or any part thereof. <br /> the Contract Documents relating to an intermediate <br /> completion date or time prior to Substantial Comple- 38. Samples—Physical examples of <br /> Lion of all the Work, materials, equipment, or workmanship that are <br /> representative of some portion of the Work and <br /> 27. Notice of Award—The written notice by which establish the standards by which such portion <br /> Owner to the Successful Bidder stating that upon of the Work will be judged. <br /> timely compliance by the Successful Bidder with the <br /> conditions precedent listed therein, Owner will sign 39. Schedule of Submittals--A schedule, <br /> and deliver the Agreement prepared and maintained by Contractor. of required <br /> submittals and the time requirements to support <br /> 28. Notice to Proceed--A written notice given scheduled performance of related construction <br /> by Owner to Contractor fixing the date on which the activities, <br /> Contract Times will commence to run and on which <br /> Contractor shall start to perform the Work under the 40. Schedule of Values--A schedule. <br /> Contract Documents. prepared and maintained by Contractor. allocating <br /> portions of the Contract Price to various portions of <br /> 29. Owner--The individual or entity with the Work and used as the basis for reviewing <br /> whom Contractor has entered into the Agreement Contractor's Applications for Payment. <br /> and for whom the Work is to be performed <br /> 41. Shop Drawings--All drawings, diagrams, <br /> 30.PCBs--Polychlorinated biphenyls. illustrations, schedules, and other data or <br /> information which are specifically prepared or <br /> FJCDC C•100 Standard General Conditions or the Contraction Contract. <br /> Cop}right c.2002 National Sociei3 of Professional Engineers for FJCDC. Ali rights reser.ed. <br /> 00700.6 <br /> 03/12 11-4179 <br />