Laserfiche WebLink
assembled by or for Contractor and submitted by 50. Unk Price Work--Work to be paid for on <br /> Contractor to illustrate some portion of the Work. the basis of unit prices. <br /> 42, Site--Lands or areas indicated in the 51. Wark--The entire construction or the <br /> Contract Documents as being furnished by Owner various separately identifiable parts thereof required <br /> upon which the Work is to be performed, including to be provided under the Contract Documents.Work <br /> rights-of-way and easements for access thereto, and includes and is the result of performing or providing <br /> such other lands furnished by Owner which are all labor, services, and documentation necessary to <br /> designated for the use of Contractor, produce such construction, and furnishing, installing, <br /> and incorporating all materials and equipment into <br /> 43. Specifications—That part of the Contract such construction, all as required by the Contract <br /> Documents consisting of written requirements for Documents.. <br /> materials, equipment, systems, standards and <br /> workmanship as applied to the Work, and certain 52. t4'brk Change Directive--A written <br /> administrative requirements and procedural matters statement to Contractor issued on or after the <br /> applicable thereto. Effective Date of the Agreement and signed by <br /> Owner and recommended by Engineer ordering an <br /> 44. Subcontractor-An individual or entity addition, deletion, or revision in the Work, or <br /> having a direct contract with Contractor or with any responding to differing or unforeseen subsurface or <br /> other Subcontractor for the performance of a part of physical conditions under which the Work is to be <br /> the Work at the Site performed or to emergencies. A Work Change <br /> Directive will not change the Contract Price or the <br /> 45. Substantial Completion--The time at Contract Times but is evidence that the parties <br /> which the Work (or a specified part thereof) has expect that the change ordered or documented by a <br /> progressed to the point where, in the opinion of Work Change Directive will be incorporated in a <br /> Engineer, the Work (or a specified part thereof) is subsequently issued Change Order following <br /> sufficiently complete, in accordance with the negotiations by the parties as to its effect if any, on <br /> Contract Documents, so that the Work (or a the Contract Price or Contract Times <br /> specified part thereof) can be utilized for the <br /> purposes for which it is intended. The terms 1.02 Terminology <br /> `substantially complete' and 'substantially com- <br /> pleted'as applied to all or part of the Work refer to A. The following words or terms are not <br /> Substantial Completion thereof defined but, when used in the Bidding Requirements <br /> or Contract Documents,have the following meaning, <br /> 46. Successful Bidder--The Bidder <br /> submitting a responsive Bid to whom Owner makes B. Intent of Certain Terms or Adjectives <br /> an award. <br /> 1. The Contract Documents include the <br /> 47: Supplementary Conditions--That part of terms as allowed.` as approved," as ordered', as <br /> the Contract Documents which amends or directed"or terms of like effect or import to authorize <br /> supplements these General Conditions, an exercise of professional judgment by Engineer. In <br /> addition, the adjectives "reasonable," `suitable," <br /> 48. Supplier--A manufacturer, fabricator, "acceptable,""proper.'"satisfactory,"or adjectives of <br /> supplier, distributor, materialman, or vendor having a like effect or import are used to describe an action or <br /> direct contract with Contractor or with any Subcon- determination of Engineer as to the Work. It is <br /> tractor to furnish materials or equipment to be intended that such exercise of professional <br /> incorporated in the Work by Contractor or any judgment, action or determination will be solely to <br /> Subcontractor evaluate, in general, the Work for compliance with <br /> the requirements of and information in the Contract <br /> 49. Underground Facilities--Alt underground Documents and conformance with the design <br /> pipelines, conduits, ducts, cables, wires, manholes, concept of the completed Project as a functioning <br /> vaults, tanks, tunnels, or other such facilities or whole as shorn or indicated in the Contract <br /> attachments, and any encasements containing such Documents (unless there is a specific statement <br /> facilities, including those that convey electricity, indicating otherwise), The use of any such term or <br /> gases, steam, liquid petroleum products, telephone adjective is not intended to and shall not be effective <br /> or other communications, cable television, water, to assign to Engineer any duty or authority to <br /> wastewater, storm water, other liquids or chemicals, supervise or direct the performance of the Work or <br /> or traffic or other control systems, any duty or authority to undertake responsibility <br /> EJCOC C-700 Standard General Condilioos of the Conslrucfior Contract. <br /> Cop}right c 2002 laiional Sotitts of Proftssional Ecenters for EJGi1C.MI rights aimed <br /> 00700.7 <br /> 03/12 11-4179 <br />