contrary to the provisions of Paragraph 9.09 or any meaning are used in the Contract Documents in
<br /> other provision of the Contract Documents. accordance with such recognized meaning.
<br /> C.Day
<br /> ARTICLE 2-PRELIMINARY MATTERS
<br /> 1. The word "day' means a calendar
<br /> day of 24 hours measured from midnight to the next
<br /> midnight. 2,01 Delivery of Bonds and Evidence of
<br /> Insurance
<br /> D. Defective
<br /> A. When Contractor delivers the executed
<br /> 1. The word'defective,'when modifying the counterparts of the Agreement to Owner, Contractor
<br /> word "Work," refers to Work that is unsatisfactory, shall also deliver to Owner such bonds as
<br /> faulty, or deficient in that it Contractor may be required to furnish
<br /> a, does not conform to the Contract 8. Evidence of Insurance: Before any Worm
<br /> Documents,or at the Site is started, Contractor and Owner shall
<br /> each deliver to the other, with copies to each
<br /> b does not meet the requirements of any additional insured identified in the Supplementary
<br /> applicable inspection, reference standard, Conditions, certificates of insurance (and other
<br /> test, or approval referred to in the Contract evidence of insurance which either of them or any
<br /> Documents or additional insured may reasonably request) which
<br /> Contractor and Owner respectively are required to
<br /> c. has been damaged prior to Engineer's - purchase and maintain in accordance with Article 5.
<br /> recommendation of final payment (unless
<br /> responsibility for the protection thereof has 2.02 Copies of Documents
<br /> been assumed by Owner at Substantial
<br /> Completion in accordance with Paragraph A. Owner shall furnish to Contractor up to
<br /> 14.04 or 94.05). ten printed or hard copies of the Drawings and
<br /> Project Manual. Additional copies will be furnished
<br /> E. Furnish, install, Perform, Provide upon request at the cost of reproduction.
<br /> 1. The word 'furnish,"when used in connec- 2.03 Commencement of Contract Times, Notice
<br /> Lion with services, materials, or equipment, shall to Proceed
<br /> mean to supply and deliver said services, materials,
<br /> or equipment to the Site (or some other specified A. The Contract Times will commence to run
<br /> location) ready for use or installation and in usable on the thirtieth day after the Effective Date of the
<br /> or operable condition. Agreement or,if a Notice to Proceed is given, on the
<br /> day indicated in the Notice to Proceed, A Notice to
<br /> 2. The word 'install,' when used in connec- Proceed may be given at any time within 30 days
<br /> tion with services, materials, or equipment, shall after the Effective Date of the Agreement. In no
<br /> mean to put into use or place in final position said event will the Contract Times commence to run later
<br /> services, materials or equipment complete and than the sixtieth day after the day of Bid opening or
<br /> ready for intended use the thirtieth day after the Effective Date of the
<br /> Agreement,whichever date is earlier.
<br /> 3. The words 'perform" or `provide,' when
<br /> used in connection with services, materials. or 2.04 Starling the Work
<br /> equipment, shall mean to furnish and install said
<br /> services, materials, or equipment complete and A, Contractor shall start to perform the Work
<br /> ready for intended use on the date when the Contract Times commence to
<br /> run. No Work shall be done at the Site prior to the
<br /> 4. When "furnish," 'install,' "perform," or date on which the Contract Times commence to run.
<br /> `provide" is not used in connection with services,
<br /> materials,or equipment in a context clearly requiring 2.05 Before Starting Construction
<br /> an obligation of Contractor. 'provide'is implied.
<br /> A. Preliminary Schedules: Within 10 days
<br /> F, Unless stated otherwise in the Contract after the Effective Date of the Agreement (unless
<br /> Documents, words or phrases which have a well- otherwise specified in the General Requirements),
<br /> known technical or construction industry or trade
<br /> FJ(tiC C-700 Standard General Conditions of the Construction Contract.
<br /> Cops right t 2002 National Soddy of Professional Engineers for EJCDC. .Ul rights Mtn d.
<br /> 04704-e